SUTTON BRIDGE POWER GENERATION

8 unique locations (84 components)

Active MW: 731.72 MW
Inactive MW: 720.31 MW
Haverton Hill Road Stockton-on-Tees Billingham TS23 1PS (5 components)
• Existing CCGT to be refurbished
• New build power station comprised of multiple reciprocating engines.
• Power station comprised of multiple reciprocating engines.
Active • 2028-29 (T-4), 2019-20 (T-1) ...
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (16 components)
• 10 x 1mw gas generator units to be installed on designated land at Burghfield Road Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• Existing CCGT
• One CHP, generating for site load which exceeds generating capacity. No aux load.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land on the east side of Cowpen Bewley Road, Billingham,  TS23 4ED (26 components)
• Gas peaking reciprocating engine
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
• Reciprocating genset
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land south of Holyhead Road, Ketley, Telford, TF1 5HS (2 components)
• 20 x 2MW gas fuelled generators installed on a compound on land south of Holyhead Road, Ketley
• Existing CCGT
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Roydon Recycling Newport 1, Blackwood Business Park, Newport Rd, Pontllanfraith, Blackwood NP12 2XN, United Kingdom (10 components)
• 6 x reciprocating engines
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (16 components)
• Existing CCGT
• Existing CCGT to be refurbished
• Sutton Bridge Project: The construction at the Sutton Bridge Power CMU (23SB01), an existing Combined Cycle Gas Turbine (CCGT) plant will include both installation of new generating equipment and the upgrade or refurbishment of the current equipment at the site. The construction will include the installation of new combustion turbines (CT), installation of new CT generators, installation of a new steam turbine (ST) and ST generator, refurbishment of the heat recovery steam generators (HRSGs), installation of a new distributed control system (DCS) and balance of plant refurbishments.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Sutton Landfill Site Huthwaite Road Sutton-In-Ashfield Mansfield, NG17 2HB (2 components)
• Existing CCGT
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2024-25 (T-1), 2022-23 (T-4)
Victory Road, Derby, Derbyshire, DE24 9HX (7 components)
• 1.6MW Combined Heat and Power at International Conference Centre
• Existing CCGT
• Existing OCGT.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Loading map...
Showing 8 locations