Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

SSE Generation Limited

58 unique locations (995 components) - Page 1 of 3

Active MW: 6861.98 MW
Inactive MW: 10342.73 MW
24a Flightway Dunkeswell Honiton EX14 4LG (2 components)
• Generating unit 3.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2025-26 (T-4), 2020-21 (T-4)
Aldon Road, Poulton - Le - Fylde, Lancashire FY6 8JL (2 components)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Genset 3
Active • 2027-28 (T-4), 2022-23 (T-4)
Asda Basildon Eastgate, Eastgate Shopping Centre , Basildon, SS14 1AE (11 components)
• Genset 2
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Biggleswade, Church Street , Biggleswade, SG18 0JS (11 components)
• 1 x hydro turbine & synchronous generator
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Bromborough, Welton Road Croft Business Park, Bromborough, CH62 3QP (11 components)
• Genset 1.
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Dundee Milton, Milton Of Craigie Longtown Road, Dundee, DD4 7RX (11 components)
• Generating unit 3.
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Sefton Park, 126 Smithdown Road , Liverpool, L15 3JR (11 components)
• Genset 3
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda South Shields, Coronation Street NE33 1AZ (8 components)
• Generating Unit 2
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (8 components)
• A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The battery system is completely independent in terms of operation, metering, ownership etc to the Biomass Station. The battery system is providing frequency response services (specifically Enhanced Frequency Response (EFR)) to National Grid Electricity Transmission plc.
• Generating Unit 3
Active • 2025-26 (T-4), 2020-21 (T-4) ...
Boston Landfill Site, Slippery Gowt Lane, Wyberton, Boston, Lincolnshire, PE21 7AA (8 components)
• 1 x hydro turbine & synchronous generator
• Solar PV generation site
• The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Bury St Edmunds Sugar Factory British Sugar plc Hollow Road Bury St Edmunds IP32 7BB (12 components)
• 1 x hydro turbine & synchronous generator
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU is a gas fired CCGT CHP
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Chichester Food Park, Bognor Rd, Chichester PO20 1NW, United Kingdom (99 components)
• Genset 2. ROCable hydro units within the BMU are not included in the CMU.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Commercial Road, Bromborough, Birkenhead, Wirral CH62 3NL (1 component)

1 x hydro turbine & synchronous generator

Active • 2026-27 (T-4)
Danes Moss Landfill Site, Gawsworth, Macclesfield, Cheshire, SK11 0LR (3 components)
• Gas fired reciprocating engine(s)
• Generating unit 3.
Active • 2027-28 (T-4), 2022-23 (T-3)
Deanie Power Station, Kiltarlity, Beauly, IV4 7JX (8 components)
• Deanie Unit 1
• ElecLink has a transmission capacity of 1000MW corresponding to its grid connection agreements and link the 400kV AC grids of France and Great Britain. ElecLink employs voltage direct current converter stations using voltage source converter technology at each side of the Channel Tunnel. 400kV AC underground cables connect the converter stations to the TSO's high voltage substations: Sellindge (NGET, UK) and Les Mandarins (RTE, France). The converter station on the Eurotunnel site at Folkestone will be connected by one 400kV AC cable circuit to the National Grid substation at Sellindge. The route length is approximately 14km. The converter station on the Eurotunnel site at Coquelles will be connected by one 400kV AC cable circuit to the RTE substation at Les Madarins. The route length is approximately 3.5km. An approximately 52km long HVDC cable circuit will connect the two converter stations via the Channel Tunnel between Folkestone and Coquelles. This will involve two single-core HVDC cables operating at +-320kV DC. Please note that in the section below we provided an address for the CMU which relates to the UK converter station site. Of course, given the CMU is an interconnector there are a variety of sites which are owned/managed by ElecLink and relate to the CMU, as additional information we have provided details of those sites below. Please note also that we have provided the grid reference points which most closely correspond to the sites, however the postcode for the address will capture a wider area. Sellindge substation Church Lane Aldington Ashford TN25 6SS Grid reference: TR082383 Converter station at Coquelles, France Eurotunnel Entrance Centre De Secours, 3573 Chemin Rouge Cambre, 62231 Coquelles, France Grid reference: TR657202
• Generating Unit 1
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Dering Way, Gravesend, DA12 2QH (Please refer to 'Thames RE - Reliance Supporting Letter T-4 2018' which is attached to the distribution connection agreement .zip file to further clarify CMU address) (3 components)
• Genset 1. ROCable hydro units within the BMU are not included in the CMU.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU Component is made up of new gas-fired engines.
Active • 2027-28 (T-4), 2024-25 (T-4) ...
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
enfinium Skelton Grange Limited South Road Knowsthorpe Leeds LS10 1RR (3 components)
• 1 x hydro turbine & synchronous generator
• SG is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (9 components)
• 1 x hydro turbine & synchronous generator
• EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
• Enfield CCGT Power Station - (one unit station)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Errochty Power Station, Tummel Bridge, by Pitlochry, Perthshire, PH16 5NT (4 components)
• CMU is a 20MW facility, metered at the distribution network boundary using a COP2 meter, with no auxilliary load on site
• Generating Unit 2
• Generating Unit 3
Inactive • 2021-22 (T-4)
Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT (27 components)
• Generating Unit 1
• Generating Unit 2
• Generating Unit 3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Fasnakyle Power Station, Cannich, Beauly, IV4 7NB (10 components)
• Generating Unit 1
• Generating Unit 2
• Generating unit 3.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Fasnakyle Power Station, Cannich, Inverness-shire, IV4 7NB (3 components)
• Generating Unit 1
• Generating unit 3.
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (166 components)
• GT3
• Genset 1.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE (16 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Genset 2.
• This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" status FCC Buckinghamshire Ltd. 300kT Energy from Waste Plant with c. 25MW net output. Auxiliary load is not included in the connection capacity i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 25 locations