SSE Generation Limited

58 unique locations (996 components) - Page 1 of 3

Active MW: 6861.98 MW
Inactive MW: 10342.73 MW
XPO - Spalding, W Marsh Rd, Spalding PE11 2HR, UK (18 components)
• 1 x hydro turbine & synchronous generator
• Flour Mill
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (19 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• EV charging at residential premises
• Generating Unit 2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Tummel Power Station, Pitlochry, Perthshire, PH16 5SB (41 components)
• 1 x hydro turbine & synchronous generator
• Battery Energy Storage system operating alongside solar farm
• Solar Farm consisting of solar PV modules and inverters
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (27 components)
• Generating Unit 1
• ROCable hydro units within the BMU are not included in the CMU.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
The Manorway, Stanford-le-Hope, Essex SS17 9LL (2 components)
• Generating Unit 1
• Reciprocating engines
Active • 2026-27 (T-4), 2020-21 (T-4)
Stagecoach Guildford, Peasmarsh, Guildford, GU3 1LZ (12 components)
• 390kW Battery Storage located at Stagecoach Guildford depot
• Genset 2
• New build battery
Active • 2026-27 (T-4), 2023-24 (T-1) ...
SMACC Melting Shop, Shepcote Lane, Europa Link, Sheffield, S9 1TZ (23 components)
• 1 x hydro turbine & synchronous generator
• Battery Energy storage linked to solar farm
• DSR component providing load turn-down at a steel melting facility with electric arc-furnaces
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Sloy Power Station, Inveruglas, By Arrochar, Argyll, G83 7DP (22 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Genset 3
• The CMU component comprises of three 2MW Reciprocating Gas Engines
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Sloy Power Station, Arrochar, G83 7DP (26 components)
• 1 x hydro turbine & synchronous generator
• Genset 2
• Genset 3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Royal Berkshire NHS Foundation Trust, London Road, Reading, RG1 5AN (4 components)
• 1 x Gas reciprocating engines with a total rated gross power capacity of 1.992 MW
• Generating Unit 2
Active • 2025-26 (T-4), 2019-20 (T-1)
Queens Road, Immingham, DN40 1QN (5 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Generating Unit 2
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
Active • 2027-28 (T-4), 2021-22 (T-4) ...
Plot 4, South Kirkby Business Park, Hemsworth, WF9 3TJ (7 components)
• A 8MW New Build gas fuelled generating station.
• Gas fired reciprocating engines.
• Generating Unit 2
Active • 2026-27 (T-4), 2023-24 (T-4) ...
Pitlochry Power Station, Port Na Craig Road, Pitlochry, Perth and Kinross, PH16 5BF (2 components)
• CMU consisting of multiple reciprocating engines and alternators
• Generating Unit 3
Active • 2028-29 (T-4), 2023-24 (T-4)
Pilsworth North, Moss Hall Road, Pilsworth, Bury, Lancashire, BL9 7JL (4 components)
• 1 x hydro turbine & synchronous generator
• Gas fired reciprocating engines.
• The CMU at the Pilsworth North Landfill site near Bury will be made up of four reciprocating engines generating from natural gas. In their current state, these engines have been designed to generate from Anaerobic Digestion (AD) biogas, but will be converted to natural gas and then recommissioned, ahead of the delivery year. The four components of the CMU (referenced VIR097, VIR098, VIR099 and VIR100) are MWM 2020 V12 units (VIR 097 is a MWM 2020 V16), built in 2011 and rated at 1,200kW (VIR097 is rated at 1,560kW). Each engine generates at 415V, which is then stepped up to 6.6kV for export.
Active • 2026-27 (T-4), 2023-24 (T-4) ...
Mucklow Hill, Dudley, West Midlands Combined Authority, West Midlands, B62 8DL (9 components)
• 1 x hydro turbine & synchronous generator
• A series of gas powered reciprocating engines, gas kiosk, DNO switchroom and associated infrastructure
• New build gas generator
Active • 2027-28 (T-4), 2022-23 (T-3) ...
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (45 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX (12 components)
• FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• Generating Unit 2
• New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Middlemore Lane, Aldridge, Walsall WS9 8ZD (4 components)
• Diesel and/or gas reciprocating engines.
• Generating Unit 1
Active • 2024-25 (T-4), 2017-18 (T-1)
Lochay Power Station, Killin, Stirling, FK21 8UA (23 components)
• Genset 1.
• Genset 2.
• Genset 2. ROCable hydro units within the BMU are not included in the CMU.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Lochay Power Station, Killin, Perthshire, FK21 8UA (9 components)
• A gas fuelled generating station.
• Post-refurbishment generating unit. ROCable hydro units within the BMU are not included in the CMU.
• Pre-refurbishment generating unit. ROCable hydro units within the BMU are not included in the CMU.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components)
• A new build 99.9MW battery energy storage system
• A new build battery energy storage system
• Genset 2
Active • 2028-29 (T-4), 2026-27 (T-4) ...