Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

SSE Generation Limited

43 unique locations (235 components) - Page 1 of 2

Active MW: 6861.98 MW
Inactive MW: 10342.73 MW
24a Flightway Dunkeswell Honiton EX14 4LG (8 components)
• New Build Generating CMU comprising of a battery storage asset (2)
• New Build CMU comprising of battery storage and associated plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Aldon Road, Poulton - Le - Fylde, Lancashire FY6 8JL (2 components)
• Battery Storage Facilty
• Energy facility comprising of reciprocating engine sets.
Inactive • 2021-22 (T-4)
Asda Basildon Eastgate, Eastgate Shopping Centre , Basildon, SS14 1AE (11 components)
• Load curtailment (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Biggleswade, Church Street , Biggleswade, SG18 0JS (11 components)
• Load curtailment (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Bromborough, Welton Road Croft Business Park, Bromborough, CH62 3QP (11 components)
• Load curtailment (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Dundee Milton, Milton Of Craigie Longtown Road, Dundee, DD4 7RX (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Sefton Park, 126 Smithdown Road , Liverpool, L15 3JR (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda South Shields, Coronation Street NE33 1AZ (8 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (7 components)

A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The …

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Boston Landfill Site, Slippery Gowt Lane, Wyberton, Boston, Lincolnshire, PE21 7AA (6 components)

Solar PV generation site

Active • 2027-28 (T-4), 2025-26 (T-4) ...
Commercial Road, Bromborough, Birkenhead, Wirral CH62 3NL (1 component)

The CMU component consist of gas fired reciprocating engines to be installed on designated land at Commercial Road, Bromborough Birkenhead, Wirral.

Active • 2024-25 (T-4)
Danes Moss Landfill Site, Gawsworth, Macclesfield, Cheshire, SK11 0LR (2 components)

Gas fired reciprocating engine(s)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Ecclesfield 35 Industrial Estate, Station Road, Sheffield, South Yourkshire, S35 9YR (7 components)
• Diesel and/or gas reciprocating engines.
• gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
enfinium Skelton Grange Limited South Road Knowsthorpe Leeds LS10 1RR (3 components)

SG is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (5 components)

EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Errochty Power Station, Tummel Bridge, by Pitlochry, Perthshire, PH16 5NT (2 components)
• Generating Unit 2
• Generating Unit 3
Inactive • 2021-22 (T-4)
Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT (28 components)
• Generating Unit 1
• Generating Unit 2
• Generating Unit 3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Fasnakyle Power Station, Cannich, Inverness-shire, IV4 7NB (3 components)
• Generating Unit 1
• Generating Unit 2
• Generating unit 3.
Inactive • 2021-22 (T-4)
FOY GARDENS BELLSHILL ML4 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
8.53 MW
Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE (9 components)

This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Kilmorack Power Station, River Beauly, By Beauly, Inverness-shire, IV4 7AL (2 components)

Kilmorack Hydro Generation Gensets 1&2 (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP17DC) (3 components)
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
• New reciprocating generating plant.
Inactive • 2021-22 (T-4)
Kirkless Landfill Site, Hemfield Close, Kirkless, Higher Ince, Wigan, WN2 2DW (3 components)

Gas fired reciprocating engine(s)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 25 locations