Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

SSE GENERATION LIMITED

28 unique locations (199 components) - Page 2 of 2

Active MW: 6861.98 MW
Inactive MW: 10342.73 MW
Next plc Brookfield Park Manvers Way Wath-Upon-Dearne Rotherham S63 5DJ (2 components)
• 3 MW of demand reduction
• ROCable hydro units within the BMU are not included in the CMU.
Inactive • 2023-24 (T-4), 2019-20 (T-1)
Port Talbot, Port Talbot Works, SA13 2NG (15 components)
• Site based CHP ( reclassified from reciprocating engine for EMR purposes given definitions in Capacity Market Auction Guidelines )
• Site based CHP - note the primary fuel are Waste Gases
• Site based auto-generation unit ( classified as reciprocating engine for EMR purposes given a Rule Change in 2018 )
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
The Emirates Stadium, Hornsey Rd, London N7 7AJ (8 components)
• Behind-the-meter battery storage system located at Emirates Stadium in London
• Behind-the-meter battery storage system located at Emirates Stadium in London.
• Generating Unit 2
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Loading map...
Showing 3 locations