SSE GENERATION LIMITED

7 unique locations (280 components)

Active MW: 4908.04 MW
Inactive MW: 12296.67 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (46 components)
• Hamms Hall - Existing Site CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Heol Ty Newydd Cross Hands Food Park, Cross Hands, Llanelli, SA14 6RF, United Kingdom (22 components)
• Load Response - Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-9G.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
High Street, Waterham, nr Faversham, Kent ME13 9EJ (17 components)
• 6 CHP engines horticultural environment with no auxiliiary load
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load curtailment
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (76 components)
• 2.8MWe back pressure steam turbine
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
Active • 2025-26 (T-1), 2024-25 (T-1) ...
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (45 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2028-29 (T-4), 2026-27 (T-4) ...
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (48 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (26 components)
• 25 MW storage site using Lithium Ion Batteries
• Existing 25 MW storage site using Lithium Ion Batteries
• N/A
Active • 2026-27 (T-4), 2025-26 (T-1) ...
Loading map...
Showing 7 locations