SSE GENERATION LIMITED

16 unique locations (463 components)

Active MW: 4908.04 MW
Inactive MW: 12296.67 MW
Torr Achilty Power Station, Urray, Muir of Ord, Ross-shire, IV6 7QF (2 components)
• Hydro Generation Gensets 1 & 2
• To be confirmed once CMU components are known
Active • 2028-29 (T-4), 2022-23 (T-4)
Recycling Centre, Warren Way, Forest Town, Mansfield, NG19 0FL (13 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Milton Keynes Hospital NHS Trust, Standing Way, Eaglestone, Milton Keynes, MK6 5LD (22 components)
• 3 x 2MW gas generator units to be installed on a compound adjacent to Droppingwell Road
• Behind the Meter Generation
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (76 components)
• 2.8MWe back pressure steam turbine
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
Active • 2025-26 (T-1), 2024-25 (T-1) ...
Land Adjacent to Stobarts Logistics Off Branthwaite Road Lillyhall Workington Cumbria CA14 4ED (16 components)
• Gas reciprocating engines
• Generating Unit 2
• The East West Interconnector (EWIC) is a 400kV HVDC link between Connah's Quay in Wales and Woodland in Ireland.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (5 components)

Mix of load reduction and standby generation

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS (23 components)
• Generating Unit 2
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (15 components)
• Aggregate CMU from multiple sources
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Gate Lodge, Boundary Farm, Styal Road, Wythenshawe, Manchester, M22 5YA (21 components)
• Energy facility comprising of reciprocating engine sets.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Foyers Power Station, Kelvin Way, Gorthleck, Foyers, Inverness-shire, IV2 6YB (17 components)
• Component has yet to be procured.
• Gas peaking reciprocating engines
• Generating Unit 1
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (166 components)
• GT3
• Genset 1.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Errochty Power Station, Tummel Bridge, by Pitlochry, Perthshire, PH16 5DF (23 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• N/A
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2027-28 (T-4), 2023-24 (T-4) ...
Connah's Quay 400 kV Substation, Kelsterton Lane, Connah?s Quay, Flintshire, North Wales, CH5 4BP (15 components)
• 10 gas reciprocating engines used for power generation, with associated infrastructure.
• A new build 49.5MW battery energy storage system
• The East West Interconnector (EWIC) is a 400kV HVDC link between Connah's Quay in Wales and Woodland in Ireland.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Clunie Power Station, Pitlochry, PH16 5NF (11 components)
• Combination of load curtailment and standby generation
• Hydro Generating Gensets 1, 2 & 3 - Clunie
• ROCable hydro units within the BMU are not included in the CMU.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (11 components)
• 48 MW Battery Energy Storage facility
• 49.5 MW Battery Energy Storage facility
• Generators on hospital site
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (27 components)
• A gas fuelled generating station.
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
• Existing CCGT Baglan Unit 1
Active • 2024-25 (T-4), 2023-24 (T-4) ...