SSE GENERATION LIMITED

23 unique locations (525 components)

Active MW: 6861.98 MW
Inactive MW: 10342.73 MW
2600 John Smith Drive, Oxford, OX4 2JY (35 components)
• Generating Unit 1
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• Operational gas reciprocating engine.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Asda Rochdale, Hanson Place, Gorrells Way, Rochdale, OL11 2NQ (4 components)
• Deanie Unit 1
• Load reduction on site supported by non-exporting standby generation.
Inactive • 2022-23 (T-3), 2020-21 (T-4) ...
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (27 components)
• A gas fuelled generating station.
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
• Existing CCGT Baglan Unit 1
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Bankside Industrial Estate, Middlefield, Glensburgh, Falkirk FK2 7XU (3 components)
• ROCable hydro units within the BMU are not included in the CMU.
• The facility consists of a 19.9MW gas facility.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (26 components)
• 1 x hydro turbine & synchronous generator
• 4MW battery co-located with a solar farm
• Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Clachan Power Station, Cairndow, By Inverary, Argyll, PA26 8BL (2 components)

1 x hydro turbine & synchronous generator

Active • 2028-29 (T-4), 2022-23 (T-3)
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Connah's Quay 400 kV Substation, Kelsterton Lane, Connah?s Quay, Flintshire, North Wales, CH5 4BP (15 components)
• 10 gas reciprocating engines used for power generation, with associated infrastructure.
• A new build 49.5MW battery energy storage system
• The East West Interconnector (EWIC) is a 400kV HVDC link between Connah's Quay in Wales and Woodland in Ireland.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Dorehouse Business Park Sheffield S13 9LT BB10 2TN (8 components)
• 1 x hydro turbine & synchronous generator
• Aggregate CMU from multiple sources
• Gas fired reciprocating engines.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
EDF Energy (Thermal Generation) Limited, Cottam Power Station, Outgang Lane, Cottam, Retford, DN22 0NP (46 components)
• 2MW - 2.3MWh Battery Energy Storage System
• CMU INO200 represents demand assets on the Inovyn ChlorVinyls Ltd site in Runcorn, Cheshire. The asset uses electricity for Chemical manufacture. Site load can easily be altered to suit demand or reduction.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. Placeholder component for empty Unproven DSR CMU - Load Reduction upon instruction
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Glenmoriston Power Station, Fort Augustus, Inverness, IV63 7YH (8 components)
• Gensets 1 & 2
• Gensets 1 & 2 ROCable hydro units within the BMU are not included in the CMU.
• Livishie Hydro Generation Genset
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Hem Heath Sir Stanley Matthews Way Trentham Lakes Trentham Stoke on Trent ST4 8GR (5 components)
• Gas reciprocating engines
• N/A
• New Build Generating CMU comprising of a battery storage asset
Active • 2028-29 (T-4), 2022-23 (T-4) ...
LAND AND BUILDINGS AT, RIVERFORD FARM WELL BARN AND CADDAFORD, STAVERTON, TOTNES, TQ9 6AF. (Nearest postcode to grid reference: TQ11 0LA). (9 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• Aggregate CMU from multiple sources
• Battery Storage Plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land at Woolaston Road, Park Farm Industrial Estate, Redditch, B987SG (11 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (76 components)
• 2.8MWe back pressure steam turbine
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
Active • 2025-26 (T-1), 2024-25 (T-1) ...
Lochay Power Station, Killin, Perthshire, FK21 8UA (9 components)
• A gas fuelled generating station.
• Post-refurbishment generating unit. ROCable hydro units within the BMU are not included in the CMU.
• Pre-refurbishment generating unit. ROCable hydro units within the BMU are not included in the CMU.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Luichart Power Station, Contin, Strathpeffer, IV14 9EW (5 components)
• Hydro Generation Gensets 1 & 2
• ROCable hydro units within the BMU are not included in the CMU.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Maybrook Road, Maybrook Business Park, Minworth, Sutton Coldfield, B76 1BE (18 components)
• N/A
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Milton Keynes Hospital NHS Trust, Standing Way, Eaglestone, Milton Keynes, MK6 5LD (22 components)
• 3 x 2MW gas generator units to be installed on a compound adjacent to Droppingwell Road
• Behind the Meter Generation
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
The Emirates Stadium, Hornsey Rd, London N7 7AJ (8 components)
• Behind-the-meter battery storage system located at Emirates Stadium in London
• Behind-the-meter battery storage system located at Emirates Stadium in London.
• Generating Unit 2
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Tickhill Road, Rotherham, South Yorkshire, S66 7QW (12 components)
• Gas fired generating unit(s)
• Generating Unit 2
• Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
Active • 2026-27 (T-4), 2023-24 (T-4) ...
West Marsh Road Spalding Lincolnshire PE11 3BB (16 components)
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Wind Turbines to be installed at Crossdykes Wind Farm
Active • 2027-28 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 23 locations