SSE GENERATION LIMITED

8 unique locations (332 components)

Active MW: 6861.98 MW
Inactive MW: 10342.73 MW
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (35 components)
• EV charging at residential premises
• Operational Reciprocating Engine
• Operational gas reciprocating engine.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (27 components)
• A gas fuelled generating station.
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
• Existing CCGT Baglan Unit 1
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Dorehouse Business Park Sheffield S13 9LT BB10 2TN (8 components)
• 1 x hydro turbine & synchronous generator
• Aggregate CMU from multiple sources
• Gas fired reciprocating engines.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Errochty Power Station, Tummel Bridge, by Pitlochry, Perthshire, PH16 5NT (4 components)
• CMU is a 20MW facility, metered at the distribution network boundary using a COP2 meter, with no auxilliary load on site
• Generating Unit 2
• Generating Unit 3
Inactive • 2021-22 (T-4)
Luichart Power Station, by Loch Luichart, Contin, Ross-shire, IV14 9EW (7 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• ROCable hydro units within the BMU are not included in the CMU.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import capacity of 38MW and export capacity of 49.5MW.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Rannoch Power Station, Rannoch, Perthshire, PH17 2QP (49 components)
• 1 x hydro turbine & synchronous generator
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...