SSE GENERATION LIMITED

447 unique locations (29170 components) - Page 1 of 18

Active MW: 1298.70 MW
Inactive MW: 15906.01 MW
AB15 (83 components)
• Domestic demand turn down
• Holford Gas Storage DSR
• Load curtailment from refridgeration
Active • 2027-28 (T-4), 2025-26 (T-1) ...
33.70 MW
AB21 (44 components)
• 1 x hydro turbine & synchronous generator
• Domestic demand turn down
• Load curtailment from refridgeration
Active • 2025-26 (T-1), 2025-26 (T-4) ...
36.48 MW
AB24 (12 components)
• Domestic EV charger
• Domestic demand turn down
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2027-28 (T-4) ...
139.49 MW
AB37 (1 component)

1 x hydro turbine & synchronous generator

Active • 2028-29 (T-4)
15.47 MW
ADLER CLOSE BRACEBRIDGE HEATH LINCOLN LN4 (3 components)
• Additional capacity alongside CMU PLYSTO. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. The Financial Milestone has been completed. Titanium Road, Waunarlwydd, Swansea, SA5 4SG SS606963
• Domestic EV charger
• ROCable hydro units within the BMU are not included in the CMU.
Active • 2025-26 (T-4), 2019-20 (T-4) ...
1.60 MW
AL3 (100 components)
• DSR components shall be assigned prior to the start of the Delivery Year.
• Domestic demand turn down
• Hydro Generation Unit
Active • 2027-28 (T-4), 2025-26 (T-1) ...
5.46 MW
AL8 (42 components)
• Domestic demand turn down
• EV charging at residential premises
• EV charging on residential premises
Active • 2025-26 (T-1), 2024-25 (T-1) ...
B27 (13 components)
• Domestic EV charge point
• EV charging at residential premises
• Lairg - 1x hydro turbine and synchronous generator
Active • 2025-26 (T-4), 2024-25 (T-4)
3.19 MW
B31 (75 components)
• Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Domestic demand turn down
• EV charging at residential premises
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B48 (24 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
• Domestic EV charger
• EV charging at residential premises
Active • 2025-26 (T-1), 2025-26 (T-4) ...
B62 (62 components)
• Callington - Existing Site CHP unit
• EV charging at residential premises
• Hydro Generation Unit
Active • 2025-26 (T-1), 2025-26 (T-4) ...
15.32 MW
B68 (23 components)
• 1 x hydro turbine & synchronous generator
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• EV charging at residential premises
Active • 2025-26 (T-1), 2025-26 (T-4) ...
36.40 MW
B74 (139 components)
• A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near Runcorn in Cheshire. Metering of output is Net of auxillary load.
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Component has yet to be procured - Unproven DSR
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B77 (137 components)
• Domestic demand turn down
• EV charging at residential premises
• This CMU identifier is the replacement of ALL001 due to changes of unit capacity and connection agreement. The connection capacity is based on historic data as per rule 3.5.3 Allington Integrated Waste Management Facility,500kT Energy from Waste Plant with c. 36MW electrical output. The auxiliary load is not included in the connection capacity i.e. The export is net. There are 2 different MPAN 1900070394446 and 1900070467983, accumulating to the total output.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B78 (64 components)
• EV charging at residential premises (2)
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B79 (64 components)
• Domestic demand turn down
• EV charging at residential premises
• EV charging on residential premises
Active • 2025-26 (T-1), 2025-26 (T-4) ...
B90 (169 components)
• A gas engine CHP site providing hot water to a local district heating network
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• This CMU unit is Causeymire wind farm, an onshore wind farm located in Scotland
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B91 (169 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Energy from Waste Facility located in Grace Road, Exeter.
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B92 (91 components)
• EV charging at residential premises
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Load curtailment from refridgeration
Active • 2025-26 (T-4), 2024-25 (T-1) ...
B93 (105 components)
• 2xHydro Generation Unit
• EV charging at residential premises
• Unit 3 at Saltend Power Station
Active • 2027-28 (T-4), 2025-26 (T-1) ...
1.89 MW
B94 (37 components)
• Domestic EV charge point
• Domestic demand turn down
• EV charging at residential premises
Active • 2025-26 (T-4), 2024-25 (T-1) ...
28.86 MW
B97 (103 components)
• 1 x hydro turbine & synchronous generator
• Domestic demand turn down
• TBC
Active • 2027-28 (T-4), 2025-26 (T-1) ...
13.35 MW
BA15 (42 components)
• EV charging at residential premises (2)
• Generating unit 3.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
20.98 MW
BA21 (34 components)
• EV charging at residential premises (2)
• EV charging on residential premises
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BB12 (61 components)
• 15.000MW of Battery Energy Storage Systems
• EV charging at residential premises
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Active • 2027-28 (T-4), 2025-26 (T-1) ...