16 unique locations (88 components)

Active MW: 4908.04 MW
Inactive MW: 12296.67 MW
1020 SLUTCHERS LANE, WARRINGTON, WA1 1QL (4 components)

gas generation

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Basin Road South. Portslade. East Sussex. BN41 1WF (6 components)
• Combined Cycle Gas Turbine plant
• N/A
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
BROOKSBY QUARRY, BROOKSBY QUARRY MELTON ROAD, BROOKSBY, LE14 2LJ (7 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• Pre-refurbishment generating unit 2
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Celtic Manor , Coldra Woods, The Usk Valley, Caerleon,Newport NP18 1HQ (8 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Court North Lane Weston-On-The-Green BICESTER OXFORDSHIRE OX25 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
Land At Mitchells Industrial Park, Bradberry Balk Lane, Wombwell, Barnsleym, S73 8HR (17 components)
• 5 MW of demand reduction
• CHP Unit
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land off Glencryan Road, on Carbrain Industrial Estate, Cumbernauld, G67 2UH. This site PQ'd last year as CCBS15 (2 components)
• An onshore windfarm consisting of 15 x 2MW Wind Turbine Generators (WTGs) in northern Scotland, Caithness
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land off Merseyton Road, Ellesmore Port CH65 2HQ (4 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• Unproven DSR Component
Inactive • 2021-22 (T-4), 2018-19 (T-1)
McCains Scarborough - Site 1, Havers Hill, Eastfield, Scarborough YO11 3BS, UK (7 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the Local distribution network and local gas network.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
PLESHEY CLOSE WESTON-SUPER-MARE BS22 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
Seamer Carr Landfill Seamer Scarborough YO12 4QA (3 components)
• 3 MW of DSR
• 3 MW of demand reduction
Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
St Andrews Road, Kings Weston Lane BS11 9FG (4 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
Tameside General Hospital, Ashton Under Lyme, OL6 9RW (7 components)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
TBA (9 components)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
• Unproven DSR Component
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Westons Hill Drive Emersons Green Bristol BS16 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
Yeomans Way, Bournemouth, BH8 0BQ (1 component)

DSR component offering load turn down at a retail store

Inactive • 2021-22 (T-4)