SSE ENERGY SUPPLY LIMITED

10 unique locations (70 components)

Active MW: 6861.98 MW
Inactive MW: 10342.73 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (10 components)

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
THE SIDINGS STATION APPROACH ROAD HEATHFIELD NEWTON ABBOT TQ12 6RG (5 components)

CMU consisting of a gas reciprocating engine and alternator

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Tameside General Hospital, Ashton Under Lyme, OL6 9RW (6 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Runcton Nursery, Lagness Road, Chichester PO20 1LJ (12 components)

Two gas CHP in a horticultural environment with no aux load

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Milton Road, Didcot, OX11 7HH (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land off Glencryan Road, on Carbrain Industrial Estate, Cumbernauld, G67 2UH. This site PQ'd last year as CCBS15 (2 components)

The facility consists of a series of gas fired generators. It connects to SPEN's network at 33kV.

Inactive • 2022-23 (T-4), 2022-23 (T-3)
Land North of Clayhill, Westoning, MK45 5JD. (5 components)

1.200MW of battery storage located at Westoning.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land North of Clayhill Farm, Westoning, MK45 5JD (9 components)
• 6.000MW of battery storage located at Westoning.
• 6.000MW of storage located at Westoning
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Greenfield Road, Westoning, Bedford, MK45 5JD (7 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...