SSE ENERGY SUPPLY LIMITED

10 unique locations (56 components)

Active MW: 7362.39 MW
Inactive MW: 9842.32 MW
Westons Hill Drive Emersons Green Bristol BS16 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
TBA (23 components)

Unproven DSR Component

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
St Andrews Road, Kings Weston Lane BS11 9FG (4 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
PLESHEY CLOSE WESTON-SUPER-MARE BS22 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
Land off Main Road, Weston, CW2 5LD (3 components)
• 20 MWs of multiple reciprocating generator units to be installed on designated land off main Road, Weston.
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Greenfield Road, Westoning, Bedford, MK45 5JD (7 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Court North Lane Weston-On-The-Green BICESTER OXFORDSHIRE OX25 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
Coleridge Rd, Weston-super-Mare BS23 3UW (8 components)

Diesel and/or gas reciprocating engines.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Clayhill Farm, Greenfield Rd, Westoning, Bedfoird, MK54 5JD (near MK45 5AD) (1 component)

44MW Storage consisting of 11 x 4MW units

Inactive • 2020-21 (T-4)
Loading map...
Showing 10 locations