SMARTESTENERGY LIMITED

8 unique locations (222 components)

Active MW: 206.44 MW
Inactive MW: 1015.19 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (30 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Plot 6 Barrow Man Road, Birchington CT7 0AX (19 components)
• CHP engine in a horticultural environment, natural gas, no aux load
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Hay Hall Road, Tyseley, Birmingham, B11 2AU (5 components)
• Aggregate CMU from multiple sources
• Energy from Waste facility
• Energy from Waste facility.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (15 components)
• Aggregate CMU from multiple sources
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Fort Parkway Heartlands Birmingham B24 9QT (7 components)
• Aggregate CMU from multiple sources
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Existing OCGT
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (47 components)
• 1.2 MW Combined Heat and Power Engine.
• 1.6 MW Combined Heat and Power Engine
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (37 components)
• Cowes 1 - OCGT, fuel is distillate MSID: 4548
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
100 Montifichet Road, Westfield, Stratford E20 1GR (62 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 MW as per the 3 highest export peaks
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
Active • 2028-29 (T-4), 2027-28 (T-4) ...