SMARTESTENERGY LIMITED

13 unique locations (401 components)

Active MW: 206.44 MW
Inactive MW: 1015.19 MW
St Johns Town of Dalry, Castle Douglas, Kirkcudbrightshire, DG7 3UB, Scotland (37 components)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX (12 components)
• FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• Generating Unit 2
• New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Lochawe, Dalmally, Argyll, PA33 1AN, Scotland (25 components)
• Refurbishment Unit 4 Cruachan pump storage hydro plant
• Unit 1 Cruachan pumped storage hydro plant
• Unit 2 Cruachan pumped storage hydro plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (10 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Land Towards The South West Of Moston Vale, Moston Vale, Manchester, M40 8WP (5 components)
• New build energy storage facility
• Newbuild gas generator
Active • 2026-27 (T-4), 2021-22 (T-4) ...
LAND AND BUILDINGS AT, RIVERFORD FARM WELL BARN AND CADDAFORD, STAVERTON, TOTNES, TQ9 6AF. (Nearest postcode to grid reference: TQ11 0LA). (9 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• Aggregate CMU from multiple sources
• Battery Storage Plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land Adjacent Lily Lane Farm Bolton Road Ashton-In-Makerfield,WN4 8TL (5 components)

New build energy storage facility

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (47 components)
• 1.2 MW Combined Heat and Power Engine.
• 1.6 MW Combined Heat and Power Engine
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (37 components)
• Cowes 1 - OCGT, fuel is distillate MSID: 4548
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (42 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• On-site existing CHP generating unit
Active • 2027-28 (T-4), 2024-25 (T-4) ...
Ardagh Group - Barnsely Site 1, Burton Road, Monk Bretton South Yorkshire S71 5RP (15 components)
• Gas-fired CHP unit
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...