SMARTESTENERGY LIMITED

87 unique locations (1216 components) - Page 1 of 4

Active MW: 206.44 MW
Inactive MW: 1015.19 MW
100 Montifichet Road, Westfield, Stratford E20 1GR (60 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 MW as per the 3 highest export peaks
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1020 SLUTCHERS LANE, WARRINGTON, WA1 1QL (4 components)

gas generation

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (15 components)
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• A completed power plant, with associated civil works, switchgear and electrical connection.
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
25 Southfield Lingard Lane Stockport SK6 2QN (16 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• Aggregate CMU from multiple sources
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
ABP UK Shrewsbury, 1 Battlefield Rd, Shrewsbury SY1 4AH, United Kingdom (24 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Milling Motor Pelletizers, Fans etc
• Ratcliffe Unit 1 coal-fired unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
ADM Milling Tilbury Flour Mill, Tilbury Docks, Tilbury, Essex,RM18 7JU (5 components)
• Flour & semolina milling business
• New build storage facility
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Ardagh Group - Barnsely Site 1, Burton Road, Monk Bretton South Yorkshire S71 5RP (15 components)
• Gas-fired CHP unit
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Avonmouth Dock, Bristol, Avon, BS11 9DL (2 components)

Flour & semolina milling business

Inactive • 2018-19 (T-1)
Barrack Road, Exeter, EX2 5DW. (6 components)
• 1.521 MW CHP unit
• Aggregate CMU from multiple sources
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Brakes - Aylesford, Unit A, Larkfield Trading Estate, New Hythe Lane, Larkfield, AYLESFORD, Kent, ME20 6SW (25 components)
• A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
• Aggregate CMU from multiple sources
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (42 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• On-site existing CHP generating unit
Active • 2027-28 (T-4), 2024-25 (T-4) ...
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (37 components)
• Cowes 1 - OCGT, fuel is distillate MSID: 4548
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Dairy Lane Westhamnett Chichester PO20 2BG (2 components)
• 4MW battery co-located with a solar farm
• Aggregate CMU from multiple sources
Active • 2028-29 (T-4), 2022-23 (T-4)
Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU (37 components)
• 2mW 2.3MWH Battery Energy Storage System
• Didcot B5 - CCGT MSID: 4055
• Didcot B6 - CCGT MSID: 4055
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Dorehouse Business Park Sheffield S13 9LT BB10 2TN (8 components)
• 1 x hydro turbine & synchronous generator
• Aggregate CMU from multiple sources
• Gas fired reciprocating engines.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Fort Parkway Heartlands Birmingham B24 9QT (7 components)
• Aggregate CMU from multiple sources
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Existing OCGT
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Funtham's Ln, Peterborough PE7 2PG, United Kingdom (65 components)
• Aggregate CMU from Multiple Sources
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Gedling Energy Park, land off Arnold lane, Gedling, Nottingham NG4 4GZ (8 components)
• 1 x MWM TCG 2020
• Aggregate CMU from Multiple Sources
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Golborne Energy Park, Off Kid Glove Road, Golborne, Warrington WA3 3DP (2 components)
• Aggregate CMU from multiple sources
• Gas fired generating units
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (15 components)
• Aggregate CMU from multiple sources
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
GRIFFITHS ROAD, LOSTOCK GRALAM, CW9 7XU (4 components)

gas generation

Inactive • 2020-21 (T-4), 2018-19 (T-1)
Grimethorpe 1 CMM Generation Plant Springvale Road Grimethorpe S72 0AL (3 components)
• 3x CAT G3520CPKG
• Aggregate CMU from multiple sources
Inactive • 2023-24 (T-4), 2017-18 (T-1)
Loading map...
Showing 25 locations