Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

SMARTESTENERGY LIMITED

45 unique locations (239 components) - Page 1 of 2

Active MW: 206.44 MW
Inactive MW: 1015.19 MW
Wheldale 1 Wheldale Generation Site Wheldale Road Castleford West Yorkshire WF10 2RR (6 components)
• Milling Motor Pelletizers, Fans etc
• New build Combined Cycle Gas Turbine unit 1 at Eggborough power station.
• load curtailment at site
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Units 13 and 14, Ashmount Business Park, Upper Forest Way, Swansea Enterprise Park, Swansea, SA6 8QR (2 components)
• 14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• Aggregate CMU from multiple sources
Inactive • 2022-23 (T-4), 2022-23 (T-3)
Unit E Main Line Industrial Estate Milnthorpe LA7 7LR (4 components)
• Aggregate CMU from multiple sources
• New build gas generator
Inactive • 2022-23 (T-3), 2017-18 (T-1)
Turweston Road, Brackley NN13 7DD (3 components)
• Aggregate CMU from multiple sources
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2018-19 (T-1)
Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FN (5 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• Aggregate CMU from Multiple Sources
• Didcot B5 - CCGT
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Toray 2, Toray Textiles, Import Way Crown Farm Way Mansfield NG19 0FN (3 components)
• CHP engine in a horticultural environment, natural gas, no aux load
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
• gas generation
Inactive • 2021-22 (T-4)
Stambermill Industrial Estate, Stourbridge DY9 7BQ (11 components)
• Aggregate CMU from Multiple Sources
• Diesel and/or gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Springfield Farm, Glendon, Kettering NN14 1QA. (6 components)
• Aggregate CMU from multiple sources
• Gas and/or diesel reciprocating engines.
Inactive • 2022-23 (T-3), 2017-18 (T-1)
Sovereign Flour Mill, Brunel Rd, CORBY, Northants, NN17 4SL (6 components)
• Flour Mill
• Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
PORT OF IMMINGHAM, AGGREGATED MICRO POWER, QUEENS ROAD, IMMINGHAM, DN40 1QN (7 components)
• gas generation
• gas-fired CHP unit
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
PEEL INDUSTRIAL ESTATE, CHAMBERHALL STREET, BURY, LANCASHIRE, BL9 0LU (7 components)
• Water treatment centre
• gas generation
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Oaks Ln, Barnsley S70 3ET (5 components)
• Aggregate CMU from Multiple Sources
• Diesel and/or gas reciprocating engines.
• gas reciprocating engines.
Inactive • 2021-22 (T-4), 2017-18 (T-1)
Moors Gorse Pumping Station, Hednesford Road, Slitting Mill, Rugeley, WS15 2UZ (13 components)
• Back up generation
• Glass manufacturing
• Onsite generation
Inactive • 2019-20 (T-1), 2017-18 (TR) ...
Mannerberg Way, Scunthorpe, East Yorkshire, DN15 8XF (6 components)
• 20 MW power plant comprising 8 x 2.5MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• Gas generators
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Malton Road, Malton YO17 8JF (1 component)

Aggregate CMU from multiple sources

Inactive • 2023-24 (T-4)
Lymedale Business Park, Holditch Road, Newcastle-under-Lyme, ST5 9JA (8 components)
• Medway CCGT
• The CMU Component is made of brand new gas-fired engines.
• The CMU Component is made up of gas-fired engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Lookabootye BROXBURN EH52 5PD (2 components)
• Aggregate CMU from Multiple sources
• New build battery
Inactive • 2022-23 (T-4), 2020-21 (T-4)
Land south of Halesfield 13, Telford, TF7 4PL (2 components)
• 5MW of Lithium Ion battery storage and power conversion systems.
• Aggregate CMU from multiple sources
Inactive • 2023-24 (T-4), 2022-23 (T-3)
LAND EAST OF PILSWORTH ROAD ROCHDALE HEYWOOD OL10 2TA (6 components)
• Aggregate CMU from multiple sources
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 25 locations