Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

SMARTESTENERGY LIMITED

14 unique locations (100 components)

Active MW: 206.44 MW
Inactive MW: 1015.19 MW
Dairy Lane Westhamnett Chichester PO20 2BG (7 components)

4MW battery co-located with a solar farm

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Grimsby Power Station Moody Lane Grimsby DN31 2SW (12 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• Ten (10) 2MWe gas reciprocating gas engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
LAND EAST OF PILSWORTH ROAD ROCHDALE HEYWOOD OL10 2TA (6 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land Off Gelderd Road, Beeston, Leeds. LS12 6DX. (3 components)

A 20MW New Build gas fuelled generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land south of Halesfield 13, Telford, TF7 4PL (2 components)

5MW of Lithium Ion battery storage and power conversion systems.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (9 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Lymedale Business Park, Holditch Road, Newcastle-under-Lyme, ST5 9JA (8 components)
• The CMU Component is made of brand new gas-fired engines
• The CMU Component is made of brand new gas-fired engines.
• The CMU Component is made up of gas-fired engines
• ... and 1 more unique description
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX (12 components)
• FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• FCC (E+M) Limited, New build 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FN (5 components)
• Gas fired generating unit
• Gas generating unit(s)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
XPO - Warrington, 48 Hardwick Grange, Woolston, Warrington WA1 4RF, United Kingdom (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 14 locations