Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

SCOTTISHPOWER RENEWABLES (UK) LIMITED

14 unique locations (36 components)

Active MW: 71.28 MW
Inactive MW: 4208.18 MW
Ardochrig Substation, off Ardochrig Road, Whitelee Windfarm, South Lanarkshire, G75 0QN (8 components)
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour (2)
• 1 x 50MW Lithium-ion battery with duration of 1 hour
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Beinn An Tuirc 3 Wind Farm, Kintyre Peninsula, Campbeltown, Argyll, PA28 6QY (5 components)

An onshore windfarm consisting of 11 x 3.6MW and 3 x 3.45MW Wind Turbine Generators (WTGs) on the Kintyre Peninsula.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Black Law Windfarm, Climpy, Forth, B715, South Lanarkshire ML11 8EW (1 component)

An onshore windfarm of 54 x 2.3MW Wind Turbine Generators with a generating capacity of 124MW and an optimised Transmission Entry Capacity of 118MW.

Active • 2028-29 (T-4)
Breach Farm Caldwell Swadlincote Derbyshire DE12 6RJ (1 component)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 10MW.

Inactive • 2020-21 (T-4)
Glendevon, Glendevon forest, A823, Perth and Kinross FK14 7JY (1 component)

An onshore windfarm of 18x1.5 MW Wind Turbine Generators with an export capacity of 27 MW.

Active • 2028-29 (T-4)
Halsary Windfarm, Off A9, Halkirk, Caithness, Scotland KW12 6UW (1 component)

An onshore windfarm consisting of 15 x 2MW Wind Turbine Generators (WTGs) in northern Scotland, Caithness

Inactive • 2021-22 (T-1)
Halsary Windfarm, Off A9, Halkirk, Caithness, Scotland KW12 6UW (4 components)

An onshore windfarm consisting of 15 x 2MW Wind Turbine Generators (WTGs) in northern Scotland, Caithness

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Harestanes Wind Farm, AE Forest, Nr Parkgate, Dumfries and Galloway, DG11 1TU (4 components)
• 1 x 50MW Lithium-ion battery with duration of 1 hour
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour
Active • 2025-26 (T-4), 2023-24 (T-1)
Land at Fiddlers Green, Carland Cross Windfarm, St. Newlands East. Windfarm Postcode: TR8 5AY (2 components)

A Solar PV site consisting of 21,987 panels of 455W Solar PV Panels

Active • 2025-26 (T-4), 2022-23 (T-1)
Land off Glencryan Road, on Carbrain Industrial Estate, Cumbernauld, G67 2UH. This site PQ'd last year as CCBS15 (2 components)

The facility consists of a series of gas fired generators. It connects to SPEN's network at 33kV.

Inactive • 2022-23 (T-4), 2022-23 (T-3)
North of Moniaive A702, Dumfries & Galloway DG7 3UG (1 component)

An onshore windfarm of 14x1.3 MW Wind Turbine Generator with an exports capacity of 18.2 MW.

Active • 2028-29 (T-4)
Whitelee Windfarm, Eaglesham Moor, to the south of Glasgow. G76 0QQ (1 component)

An onshore windfarm of 140x2.3 MW Wind turbine Generators with an export capacity of 305 MW. It is shared with a 50MW BESS project (CMU - WLBAT1)

Active • 2028-29 (T-4)
Loading map...
Showing 14 locations