Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

REGENT PARK ENERGY LIMITED

15 unique locations (203 components)

Active MW: 33.47 MW
Inactive MW: 214.30 MW
Thurscoe Business Park, Barrowfield Rd, Thurscoe, Rotherham S63 0DB (4 components)
• 5MW of Lithium Ion battery storage and power conversion systems.
• Gas reciprocating engines
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Thurscoe Business Park, Barrowfield Rd, Thurscoe, Rotherham S63 0BH (7 components)
• Gas fired generating units
• Gas reciprocating engines
• N/A
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Marchwood ERF, Oceanic Way, Marchwood Industrial Park, Normandy Way, Marchwood, Hampshire SO40 4BD (13 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• New Battery Storage Site comprising brand new batteries & inverters
• SolarPV generating station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Manvers Callflex Business Park South of Doncaster Road Rotherham S63 7EF (6 components)
• Aggregate CMU from Multiple Sources
• Gas generating unit(s)
• Gas reciprocating engines
Active • 2028-29 (T-4), 2023-24 (T-1) ...
land adjacent to the FIFE GRID SERVICES FACILITY 275KV SUBSTATION, adjacent to the A876 at Kincardine, Fife, FK10 4BL. (31 components)
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• Lithium ion battery storage plant
• SolarPV generating station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Iwmf, Padworth Lane, Paworth Sidings, Lower Padworth, West Berkshire, RG7 4HY (10 components)
• EV charging on residential premises
• Gas reciprocating engines
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Hem Heath, Sir Stanley Matthews Way, Trentham Lakes, Trentham, Stoke on Trent, ST4 8GR (8 components)
• Gas fired reciprocating engine(s)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Hem Heath 2 CMM Generation Sir Stanley Mathews Way Trentham Lakes Trentham Stoke on Trent ST4 4DD (3 components)
• 1x 2.00MW Containerised Generating sets.
• EV charging at residential premises
Inactive • 2023-24 (T-1), 2016-17 (TR)
Grimethorpe 1 CMM Generation Plant Springvale Road Grimethorpe S72 0AL (3 components)
• 3x CAT G3520CPKG
• Aggregate CMU from multiple sources
Inactive • 2023-24 (T-4), 2017-18 (T-1)
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Berry Agile Solutions, Ellough Industrial Area, Ellough, Suffolk, NR34 7TB, UK (4 components)
• Gas fired generating units
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-1), 2023-24 (T-4) ...
Askern CMM Generation, Campsall Road, Askern, Doncaster DN6 0FD (16 components)
• Gas fired reciprocating engines
• Gas-fired reciprocating engines
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Askern CMM Generation, Campsall Road, Askern, Doncaster DN6 0BZ (10 components)
• Battery storage
• Gas fired generating units
• To be confirmed once CMU components are known
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
ASDA Washington ADC, Pattinson Ind Est District 15, NE38 8QA (12 components)
• Existing OCGT
• Load curtailment from refridgeration
• Load reduction from refrigeration
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 15 locations