Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

REGENT PARK ENERGY LIMITED

70 unique locations (427 components) - Page 3 of 3

Active MW: 33.47 MW
Inactive MW: 214.30 MW
Former Brodsworth Main Colliery, Long Lands Lane, Brodsworth, Doncaster, DN5 7XB (6 components)
• Battery Storage
• Gas fired generating engines
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (92 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage).
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Cadeby 1 CMM Generation Garden Lane Cadeby Doncaster DN5 7SN (7 components)
• 1x 2.00MW Containerised Generating sets.
• Gas fired generating sets.
• Gas generating unit(s)
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Cadeby 1 CMM Generation Garden Lane Cadeby Doncaster DN5 7SN (3 components)
• 1x 2.00MW Containerised Generating sets.
• Gas generating unit(s)
Inactive • 2019-20 (T-1), 2016-17 (TR)
Brogoborugh Landfill Site Woburn Road Brogborough Bedfordshire MK43 0TN (4 components)

1 x Merlees 6MW reciprocating engine and all associated auxiliary equipment

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Brogoborugh Landfill Site Woburn Road Brogborough Bedfordshire MK43 0TN (2 components)

1 x Merlees 6MW reciprocating engine and all associated auxiliary equipment

Inactive • 2017-18 (T-1)
Brogborough Landfill Site Woburn Road Brogborough Bedfordshire MK43 0TN (4 components)

A 6MW Merlees diesel reciprocating engine connected to this distribution network

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Brogborough Landfill Site Woburn Road Brogborough Bedfordshire MK43 0TN (2 components)

A 6MW Merlees diesel reciprocating engine connected to this distribution network

Inactive • 2017-18 (T-1)
Boston Landfill Site, Slippery Gowt Lane, Wyberton, Boston, Lincolnshire, PE21 7AA (6 components)

Solar PV generation site

Active • 2027-28 (T-4), 2025-26 (T-4) ...
Berry Agile Solutions, Ellough Industrial Area, Ellough, Suffolk, NR34 7TB, UK (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-1), 2023-24 (T-4)
Askern CMM Generation, Campsall Road, Askern, Doncaster DN6 0FD (16 components)
• Gas fired generating unit(s)
• Gas fired reciprocating engines
• Gas reciprocating engine(s)
• ... and 1 more unique description
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Askern CMM Generation, Campsall Road, Askern, Doncaster DN6 0BZ (10 components)
• Battery storage
• Gas fired generating unit
• Gas fired generating units
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Askern 1 CMM Generation Campsall Road Askern Doncaster DN6 0BZ (4 components)
• 1x 2.00MW Containerised Generating sets.
• Gas fired generating sets.
Inactive • 2021-22 (T-4), 2016-17 (TR)
Askern 1 CMM Generation Campsall Road Askern Doncaster DN6 0BZ (2 components)

1x 2.00MW Containerised Generating sets.

Inactive • 2016-17 (TR)
ASDA Washington ADC, Pattinson Ind Est District 15, NE38 8QA (12 components)
• Load curtailment from refridgeration
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 20 locations