RWE GENERATION UK PLC

35 unique locations (279 components) - Page 1 of 2

Active MW: 20407.06 MW
Inactive MW: 42306.65 MW
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (8 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
RWE Generation UK plc, Cheshire Power Station North Road, Ellesmere Port Cheshire CH65 1AF (2 components)

The CMU will be formed of multiple battery storage units and medium voltage stations (inverter and battery transformer) connected in parallel.

Active • 2026-27 (T-4), 2025-26 (T-4)
River E Hydroelectric Generating Station, Gorthleck,Inverness IV2 6UL (2 components)

Hydroelectric run of river generating plant

Active • 2028-29 (T-4)
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (7 components)
• Battery Project on Greenfield Site
• New Build transmission connected Battery Storage site on land Adjacent to National Grid's Rainhill Substation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land adjacent to Norrington Common BSP, Norrington Lane, Broughton Gifford, Melksham, Wiltshire, SN12 8LT (4 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4)
Inverbain Hydro, Shieldaig, Strathcarron, Ross-Shire IV54 8XH (3 components)

Hydroelectric plant

Active • 2028-29 (T-4), 2027-28 (T-4)
Hythe Power Station Charleston Road Hardley Hythe Southampton SO45 3BP (9 components)
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines . MSID: 7174
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: 7174
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Grimsby Power Station Moody Lane Grimsby DN31 2SW (12 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• Ten (10) 2MWe gas reciprocating gas engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Grimsby Power Station Moody Lane Grimsby DN31 2SW (4 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• Ten (10) 2MWe gas reciprocating gas engines
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Great Yarmouth Power Station South Denes Road Great Yarmouth Norfolk NR30 3PY (12 components)
• Great Yarmouth 1 - CCGT
• Great Yarmouth 1 - CCGT MSID: 7111
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Garrogie Hydro, Nr Whitebridge, Inverness-shire, IV2 6UR (3 components)

Hydroelectric Plant

Active • 2028-29 (T-4), 2027-28 (T-4)
Garnedd Hydro, Dolwyddelan, Gwynedd, LL25 0JQ (2 components)

Hydroelectric plant

Active • 2028-29 (T-4), 2027-28 (T-4)
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (6 components)

CMU to comprise multiple individual storage units metered and despatched centrally

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (10 components)
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-19, EMD-19 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 141.040 MW At these three HH times, aux load on Unit 5 = 2.597 MW Net generation from Unit 5 = 138.443 MW
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-21 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 137.533 MW At these three HH times, aux load on Unit 5 = 2.513 MW Net generation from Unit 5 = 135.020 MW
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCO1. All Components of EMG-18, EMD-U3 and EMD-T1 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. Gross 3 HH av. peak generation from Unit 5 on separate days = 139.707 MW At these three HH times, aux load on Unit 5 = 2.517 MW Net generation from Unit 5 = 137.190 MW
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Drayton Garden Village CHP, Porters Way, Hillingdon, Greater London, UB7 9AA (11 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Douglas Water Hydroelectric Generating Station, near Inveraray, Argyll, PA32 8XT (3 components)

Hydroelectric run of river power station

Active • 2028-29 (T-4)
Dolgarrog Power Station, Dolgarrog, Conwy, LL32 8QE (6 components)

Hydroelectric plant

Active • 2028-29 (T-4), 2027-28 (T-4)
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (11 components)
• One (1) Open Cycle Gas Turbine
• One (1) Open Cycle Gas Turbine MSID: 7382
• One (1) Open Cycle Gas Turbine MSID: 7382
Active • 2028-29 (T-4), 2025-26 (T-1) ...
Loading map...
Showing 25 locations