Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

RWE GENERATION UK PLC

55 unique locations (731 components) - Page 2 of 3

Active MW: 20407.06 MW
Inactive MW: 42306.65 MW
Grimsby Power Station Moody Lane Grimsby DN31 2SW (12 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• Ten (10) 2MWe gas reciprocating gas engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Hythe Power Station Charleston Road Hardley Hythe Southampton SO45 3BP (9 components)
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines . MSID: 7174
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: 7174
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Inverbain Hydro, Shieldaig, Strathcarron, Ross-Shire IV54 8XH (3 components)

Hydroelectric plant

Active • 2028-29 (T-4), 2027-28 (T-4)
King?s Lynn Power Station Willows Business Park Saddlebow Kings Lynn PE34 3RD (1 component)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive • 2020-21 (T-4)
Kings Lynn Power Station Willows Business Park Saddlebow, Kings Lynn PE34 3RD (4 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Little Barford Power Station Little Barford St Neots PE19 6YT (28 components)
• Little Barford 1 CCGT
• Little Barford 1 CCGT MSID: 4052
• Little Barford 1 OCGT . fuel type is distillate
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Markinch Power Station Glenrothes KY7 6GU (1 component)

The CMU will be formed of multiple gas reciprocating engines.

Inactive • 2022-23 (T-4)
ME2 (24 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
61.07 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (68 components)
• Pembroke 11 - CCGT
• Pembroke 11 - CCGT MSID: 7237
• Pembroke 21 - CCGT
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
PL7 (42 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
53.44 MW
RG31 (42 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
61.07 MW
River E Hydroelectric Generating Station, Gorthleck,Inverness IV2 6UL (2 components)

Hydroelectric run of river generating plant

Active • 2028-29 (T-4)
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (2 components)

Hythe Power Station - Auxiliary load behind boundary meter

Inactive • 2017-18 (T-1)
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (5 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
RWE Cogen UK Limited (formerly know as Bridgewater Paper CHP) North Road Ellesmere Port South Wirral CH65 1AF (2 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• One (1) Open Cycle Gas Turbine
Inactive • 2021-22 (T-4)
RWE Cogen UK Ltd North Road Ellesmere Port South Wirral CH65 1AF (2 components)

Cheshire OCGT - Currently no additional load on the Private Network - Auxiliary load behind boundary meter

Inactive • 2017-18 (T-1)
RWE Cogen UK Ltd North Road Ellesmere Port South Wirral CH65 1AF (7 components)
• CMU will be formed of multiple individual gas reiprocating engine units
• Cheshire OCGT - Currently no additional load on the Private Network - Auxiliary load behind boundary meter
Inactive • 2020-21 (T-4), 2017-18 (T-1)
RWE Cogen UK Ltd North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)

Conoco Phillips CCGT - Private Network connected to Conoco Phillips Refinery - Auxiliary load behind CMU meter

Inactive • 2017-18 (T-1)
RWE Cogen UK Ltd North South Access Road Seal Sands Middlesbrough TS2 1FB (4 components)

Conoco Phillips CCGT - Private Network connected to Conoco Phillips Refinery - Auxiliary load behind CMU meter

Inactive • 2020-21 (T-4), 2017-18 (T-1)
RWE Ferrybridge A Workshops Old North Road Ferrybridge Knottingley WF11 8NG (1 component)

CMU will be formed of multiple individual gas reciprocating engine units

Inactive • 2021-22 (T-4)
Loading map...
Showing 25 locations