Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

RWE GENERATION UK PLC

17 unique locations (513 components)

Active MW: 14629.16 MW
Inactive MW: 48084.56 MW
Academy CHP, Lodge Avenue, Academy Way, Dagenham, London, RM8 2JA (14 components)
• 20 x 1mw gas generator units to be installed on designated land at Stratford Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• A as engine CHP site providing hot water to a local district heating network
• A gas engine CHP site providing hot water to a local district heating network
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Asda Greengates, 147 New Line , Bradford, BD10 0BT (12 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (57 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• The CMU component is a combined cycle gas turbine
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Drayton Garden Village CHP, Porters Way, Hillingdon, Greater London, UB7 9AA (15 components)
• A gas engine CHP site providing hot water to a local district heating network
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Pembroke 11 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
EDF Energy, Sizewell B power station, Nr Leiston, Suffolk, IP16 4UR (39 components)
• Sizewell B Power Station CMU 1: [SZ1-24] T_SIZB-1 + (50% x T_SIZB-D)
• Sizewell B Power Station CMU 2: [SZ2-23] T_SIZB-2 + (50% x T_SIZB-D)
• Sizewell B Power Station CMU 2: [SZ2-24] T_SIZB-2 + (50% x T_SIZB-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU (34 components)
• Torness Power Station CMU 1: [TN1-23] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 1: [TN1-24] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 2: [TN2-24] T_TORN-2 + (50% x T_TORN-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Elephant Park Energy Centre, Rodney Road, London, SE17 1FJ (6 components)
• A site with two gas engine CHPs providing hot water to a local district heating network
• A site with two gas engine CHPs, providing hot water to a local district heating network
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (125 components)
• Aux. load separately metered
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• GT8
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Fielding & Johnson Building University Of Leicester University Road LEICESTER Leicestershire LE1 7RH (51 components)
• Combined Heat and Power Plant, University of Leicester, capacity of generator 1.600MW
• Combined Heat and Power Plant, University of Leicester, generator's capacity 1.600MW
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (16 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• Heysham 2 Power Station CMU 8: [HY2823] T_HEYM28 + (50% x T_HEYM2-D)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Runcton Nursery, Lagness Road, Chichester PO20 1LJ (16 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Load reduction on site supported by non-exporting standby generation.
• Two gas CHP in a horticultural environment with no aux load
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (18 components)
• Combined Cycle Gas Turbine
• One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load.
• One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (23 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• Gas fired CHP unit
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (8 components)
• A gas engine CHP site providing hot water to a local district heating network
• Didcot B5 - CCGT MSID: 4055
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 17 locations