Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ROOT-POWER (NORTH) LIMITED

16 unique locations (113 components)

Active MW: 0.00 MW
Inactive MW: 117.32 MW
WINDERMERE ROAD WEST END SOUTHAMPTON SO18 (2 components)
• A 50MW Distribution Connected Battery Energy Storage System
• New build power station comprised of multiple reciprocating engines.
Active • 2028-29 (T-4), 2018-19 (T-1)
10.47 MW
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (4 components)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
Tower Road Epping Essex CM16 (2 components)

A 50MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4), 2025-26 (T-4)
20.87 MW
SG12 (54 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
Selby, North Yorkshire, YO8 6PG (4 components)
• A 40MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
Mill Road MURROW Murrow Wisbech Cambrideshire PE13 (2 components)
• A 50MW Distribution Connected Battery Energy Storage System
• Domestic EV charger
Active • 2028-29 (T-4), 2025-26 (T-1)
Land On The South East Side Of Medlock Road, Failsworth, Manchester M35 9WG (1 component)

A 30MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
HORSESHOE CRESCENT HOUGHTON CONQUEST BEDFORD BEDFORDSHIRE MK45 (3 components)
• A Distribution Connected Battery Energy Storage System
• Domestic EV charger
• Middlesbrough. 1570000106212. Gas CHP engines - two 1.47MW and one 1.51MW.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.38 MW
HOOK CLOSE AMPFIELD ROMSEY HAMPSHIRE SO51 (2 components)
• A 50MW Distribution Connected Battery Energy Storage System
• The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 MW.
Active • 2028-29 (T-4), 2022-23 (T-1)
10.47 MW
High Cup Heights Carleton Village Penrith Cumbria CA11 (2 components)
• A 40MW Distribution Connected Battery Energy Storage System
• Battery situated behind-the-meter with demand at a commercial site
Active • 2028-29 (T-4), 2020-21 (T-1)
16.70 MW
Frideswide Street Buckingham MK18 (2 components)
• A 30MW Distribution Connected Battery Energy Storage System
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. Placeholder component for empty Unproven DSR CMU - Load Reduction upon instruction
Active • 2028-29 (T-4), 2022-23 (T-1)
6.28 MW
EMPIRE CRESCENT HANHAM BRISTOL AVON BS15 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
EH13 (29 components)

Domestic EV charger

Active • 2025-26 (T-1), 2024-25 (T-1) ...
8.38 MW
EDWARD STREET NORMANTON WF6 (3 components)
• A Distribution Connected Battery Energy Storage System
• Domestic EV charger
• Milton Keynes. 1160001070671. Two 3.0 MW gas CHP engines.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
10.47 MW
Cooklands farm, Old Snydale, Pontefract, WF7 6HA (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
Ardencaple Farm, Rhu, Helensburgh, Argyll & Bute, G84 8JX (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
Loading map...
Showing 16 locations