Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

REGENT PARK ENERGY LIMITED

72 unique locations (449 components) - Page 1 of 3

Active MW: 33.47 MW
Inactive MW: 214.30 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (20 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Active • 2024-25 (T-4), 2023-24 (T-1) ...
Tickhill Road, Rotherham, South Yorkshire, S66 7QW (12 components)
• Gas fired generating unit(s)
• Generating Unit 2
• Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
Active • 2026-27 (T-4), 2023-24 (T-4) ...
tickhill road, Rotherham, South Yorkshire, S66 7QW (8 components)
• 6 x 1.4Mw Jenbacher JGC420GS-SL
• Gas fired generating unit
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Thurscoe Business Park, Barrowfield Rd, Thurscoe, Rotherham S63 0DB (4 components)
• 5MW of Lithium Ion battery storage and power conversion systems.
• Gas reciprocating engines
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Thurscoe Business Park, Barrowfield Rd, Thurscoe, Rotherham S63 0BH (7 components)
• Gas fired generating units
• Gas reciprocating engines
• N/A
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Stanley Matthews Way Trentham Lakes Trentham ST4 4DD (4 components)

1 x CAT G3520CPKG

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Rhymney 1 STOR Gen Room Unit 48 Portmanmoor Road Industrial Estate Rover Way Cardiff CF24 5HB (4 components)
• Gas fired reciprocating engines
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2024-25 (T-1), 2022-23 (T-3) ...
Marchwood ERF, Oceanic Way, Marchwood Industrial Park, Normandy Way, Marchwood, Hampshire SO40 4BD (13 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• New Battery Storage Site comprising brand new batteries & inverters
• SolarPV generating station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Manvers Callflex Business Park South of Doncaster Road Rotherham S63 7EF (6 components)
• Aggregate CMU from Multiple Sources
• Gas generating unit(s)
• Gas reciprocating engines
Active • 2028-29 (T-4), 2023-24 (T-1) ...
Manvers 1 CMM Generation Off Golden Smithies Lane S63 7DN (2 components)

1x CAT G3520CPKG & MWM TBG 620V 16K

Inactive • 2017-18 (T-1)
Manvers 1 CMM Generation Off Golden Smithies Lane S63 7DN (1 component)

1x CAT G3520CPKG & MWM TBG 620V 16K

Inactive • 2017-18 (T-1)
Maltby 1 Colliery Ltd Tickhill Road Rotherham South Yorkshire S66 7QW (4 components)
• 8x 1.40MW Containerised Generating sets.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2022-23 (T-3), 2016-17 (TR)
Maltby 1 Colliery Ltd Tickhill Road Rotherham South Yorkshire S66 7QW (4 components)
• 8x 1.40MW Containerised Generating sets.
• Gas fired generating sets.
Inactive • 2021-22 (T-4), 2016-17 (TR)
Land to the South of Wolverhampton Penn sub-station, Union Lane, Lower Penn, South Staffordshire, WV5 7JD. (4 components)
• Energy facility comprising of reciprocating engine sets.
• Gas fired generating unit(s)
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land off Station lane, Monkton Mains, Wormald Green, Harrogate HG3 3QA (5 components)
• 10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements
• 1x CAT G3520CPKG & MWM TBG 620V 16K
• Longannet coal fired power station - Unit 3
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land off Hatfield Lane - Edenthorpe - Doncaster - DN3 2NW (4 components)

3x 1.56MW Containerised Generating Sets. Markham Main 1 - Land off Hatfield Lane - Edenthorpe - Doncaster - DN3 2NW. Auxiliary load subtracted prior to the metering point.

Inactive • 2017-18 (T-1)
Loading map...
Showing 25 locations