Peak Power Connections Limited

7 unique locations (51 components)

Active MW: 242.68 MW
Inactive MW: 2019.24 MW
Stambermill Industrial Estate, Stourbridge DY9 7BQ (11 components)
• Aggregate CMU from Multiple Sources
• Diesel and/or gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Sheepbridge Lane, Sheepbridge, Chesterfield, S41 9RX (6 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Diesel and/or gas reciprocating engines.
• This DSR component is an industrial and commercial site which can reduce its imported electricity.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (7 components)
• 0.5MW of demand reduction
• A generating station consisting on multiple reciprocating engines and alternators located on a single site
• Sizewell B Power Station CMU 2: [SZ2-19] T_SIZB-2 + (50% x T_SIZB-D)
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Oaks Ln, Barnsley S70 3ET (5 components)
• Aggregate CMU from Multiple Sources
• Diesel and/or gas reciprocating engines.
• gas reciprocating engines.
Inactive • 2021-22 (T-4), 2017-18 (T-1)
Land at Rhyd y Groes Rhosgoch Anglesey, Wales LL66 0AT (5 components)
• 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales.
• Component has yet to be procured.
• Load reduction upon instruction
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Four Ashes 803 - 030, 1 Station Road, Four Ashes, Wolverhampton, WV10 7DG (12 components)
• Diesel and/or gas reciprocating engines.
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Clayburn Rd, Grimethorpe, Barnsley S72 7BE (5 components)
• Diesel and/or gas reciprocating engines.
• Unproven DSR yet to be procured
Inactive • 2021-22 (T-4), 2017-18 (T-1)
Loading map...
Showing 7 locations