PULSE CLEAN ENERGY UK LIMITED

18 unique locations (50 components)

Active MW: 17.37 MW
Inactive MW: 25.75 MW
Baglan Energy Park, Briton Ferry, Port Talbot, SA11 2GA (3 components)
• New build one-hour duration storage to replace diesel plant (2)
• One-hour duration Battery Storage Plant.
Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT01 BATT01 SA11
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Brunel Way, Briton Ferry, SA11 2GA (7 components)

Gas fired reciprocating engines. (3)

Reciprocating engines PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU Briton Ferry Briton Ferry +3 more Not Prequalified SA11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Duncombe Road, Girlington, Bradford, BD8 9AL (2 components)

New build one-hour duration storage to replace diesel plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
Faraday Road, Plymouth, PL4 0SR (2 components)

New build one-hour duration storage to replace diesel plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
Faraday Road, Plymouth, PL4 0ST (4 components)
• Gas fired reciprocating engines. (2)
• Reciprocating Engines
Active • 2024-25 (T-4), 2021-22 (T-4) ...
Great Field Lane, Somerden Road, Hull, HU9 5QJ (2 components)

New build one-hour duration storage to replace diesel plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
High Flatworth, North Shields, Tyne and Wear, NE29 7SW (3 components)
• New build one-hour duration storage to replace diesel plant (2)
• One-hour duration battery storage project.
Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT09 BATT09 NE29
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Main Ave, Hirwaun, CF44 9UY (5 components)
• Additional capacity alongside the long term STOR at Hirwaun & Dowlais. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. (2)
• Reciprocating engines
Reciprocating Engines Dockside Power Limited Existing Generating CMU Hirwaun Hirwaun +1 more CF44
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (4 components)
• New build one-hour duration storage to replace diesel plant (2)
• New build two-hour duration storage to replace diesel plant
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Pengarnddu Ind Est, Dowlais Top CF48 2TA (2 components)

Additional capacity alongside the long term STOR at Dowlais (Merthyr Tydfil). The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to … (2)

PULSE CLEAN ENERGY UK LIMITED Existing Generating CMU Hirwaun and Dowlais CF48
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Plot, Pengarnodu Est, Methyr Tydfil, CF48 2YE (2 components)

New build one-hour duration storage to replace diesel plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
Tir John North Road, St Thomas, SA1 8NS (1 component)

Gas fired reciprocating engines.

Reciprocating engines PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU DG004 Not Prequalified SA1
Active • 2024-25 (T-4)
TIR John North Road, St Thomas, Swansea, SA1 7BG (2 components)
• New build one-hour duration storage to replace diesel plant
• One Hour Duration Battery Storage Plant
Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT02 SA1
Active • 2025-26 (T-4), 2024-25 (T-1)
TIR John North Road, St Thomas, Swansea, SA1 7BG / SA1 8NZ (1 component)

New build one-hour duration storage to replace diesel plant

Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT02 SA1
Inactive • 2023-24 (T-1)
West Thorpe, Willoughby-on-the-wold, LE12 6TD (3 components)

New build one-hour duration storage to replace diesel plant (3)

Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT05 BATT05 LE12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
West Thorpe, Willoughby on the Wolds, LE12 6TD (5 components)
• Additional capacity alongside other plant at Willoughby. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. The Financial Milestone was been completed before the previous auction. (2)
• Reciprocating engines
Reciprocating Engines Dockside Power Limited Existing Generating CMU New Build Generating CMU Willoughby Willoughby +1 more LE12
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...