PIVOTED POWER LLP

5 unique locations (5 components)

Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
Land directly South to Coventry Substation Parrotts Grove Coventry CV2 1NQ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
Land north east of Bustleholm Substation Painswick Close Walsall WS5 4SJ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
Land north west of Braintree Substation, Braintree Road, Cressing, Braintree, CM77 8EZ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2025-26 (T-1)
15.48 MW