PEAK GEN POWER LIMITED

6 unique locations (87 components)

Millfield Lane Haydock Industrial Estate Haydock St Helens WA11 9UT (13 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.27 MW
Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (10 components)
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-19, EMD-19 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 141.040 MW At these three HH times, aux load on Unit 5 = 2.597 MW Net generation from Unit 5 = 138.443 MW
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCO1. All Components of EMG-18, EMD-U3 and EMD-T1 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. Gross 3 HH av. peak generation from Unit 5 on separate days = 139.707 MW At these three HH times, aux load on Unit 5 = 2.517 MW Net generation from Unit 5 = 137.190 MW
• Unit 5 is a Cogeneration unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG244 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power generation units on the site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02).
Active • 2028-29 (T-4), 2027-28 (T-4) ...
126.55 MW
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (34 components)
• The CMU component is a combined cycle gas turbine
• This CMU (CARRI3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
• This CMU (CGTN_3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
827.65 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (12 components)

A completed power plant, with associated civil works, switchgear and electrical connection. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.31 MW
Booker Cash and Carry Didcot OX11 7HJ (7 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.14 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (11 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.61 MW
Loading map...
Showing 6 locations