Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

PEAK GEN POWER LIMITED

8 unique locations (310 components)

Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (11 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.63 MW
Booker Cash and Carry Didcot OX11 7HJ (7 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.14 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (12 components)

A completed power plant, with associated civil works, switchgear and electrical connection. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.67 MW
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (34 components)
• The CMU component is a combined cycle gas turbine
• This CMU (CARRI3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
• This CMU (CGTN_3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2492.31 MW
Component has yet to be procured. (210 components)

Component has yet to be procured.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (10 components)
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at …
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at …
• Unit 5 is a Cogeneration unit which produces both steam and power. Unit 5 is the largest generating unit at …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
379.81 MW
McCain - Scarborough, Havers Hill, Eastfield, YO11 3BS (13 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2026-27 (T-4), 2024-25 (T-4) ...
Millfield Lane Haydock Industrial Estate Haydock St Helens WA11 9UT (13 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.80 MW
Loading map...
Showing 8 locations