Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

P3P LANE END LIMITED

3 unique locations (70 components)

Active MW: 37.26 MW
Inactive MW: 116.65 MW
CH65 (22 components)

Domestic EV charger

Active • 2025-26 (T-1), 2025-26 (T-4) ...
Lane End Energy Centre 1 Macketts Lane, Hale Common, Newport PO30 3AS Isle of Wight (14 components)

The CMU LANE16 consists of two identical components (JENBA4 &5), with each CHP engine delivering 1.845MW (1.942MW design output but derated at 95% due to their age). The total CMU …

Active • 2020-21 (T-4), 2017-18 (T-1)
SK14 (34 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
Loading map...
Showing 3 locations