P3P ENERGY MANAGEMENT AE LIMITED

3 unique locations (32 components)

Active MW: 49.74 MW
Inactive MW: 104.18 MW
Asda Chepstow ADC, Newhouse Farm Ind Est, Chepstow, NP16 6UD (13 components)
• A Battery Energy Storage System.
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (7 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (12 components)
• A gas engine CHP site providing hot water to a local district heating network, as well as providing some power direct via private wire to a local hotel
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
Active • 2028-29 (T-4), 2026-27 (T-4) ...