Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OSSPV001 LIMITED

4 unique locations (15 components)

Lower Road, Brentwood, CM13 1BZ (2 components)
• Advanced battery energy storage system
• New Build Generation CMU, advanced battery energy storage system
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Port of Tilbury, Tilbury, RM18 7EH (2 components)
• New Build Generation CMU, advanced battery energy storage system.
• Site demand offset by onsite behind the meter advanced battery energy storage system.
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Tilbury Freeport Tilbury Essex RM18 7EH (2 components)

Demand side response in reduction of demand with the private HV network at the Port Of Tilbury (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Tilbury Freeport Tilbury Essex RM18 7HE (9 components)

Demand side response in reduction of demand with the private HV network at the Port Of Tilbury. This is a battery energy storage system with communications to the port's metering … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 4 locations