Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OHME OPERATIONS UK LIMITED

763 unique locations (23148 components) - Page 11 of 31

Active MW: 39.94 MW
Inactive MW: 0.00 MW
G68 (26 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
39.94 MW
G71 (49 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
39.94 MW
G73 (12 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
39.94 MW
G76 (25 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
39.94 MW
G83 (11 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
39.94 MW
GL10 (27 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
39.94 MW
GL14 1DZ (1 component)

Domestic EV charge point

Active • 2025-26 (T-1)
39.94 MW
GL3 (48 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
39.94 MW
GL51 (49 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
39.94 MW
GL52 (37 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
39.94 MW
GU15 (52 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
39.94 MW
GU17 (16 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
39.94 MW
GU18 5YE (1 component)

Domestic EV charge point

Active • 2025-26 (T-1)
39.94 MW
GU2 (22 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
39.94 MW
GU30 (10 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
39.94 MW
GU31 (30 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
39.94 MW
GU34 (70 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
39.94 MW
GU4 7RE (1 component)

Domestic EV charge point

Active • 2025-26 (T-1)
39.94 MW
GU7 (32 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
39.94 MW
GU9 (37 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
39.94 MW
HA2 (34 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
39.94 MW
HA3 0QG (1 component)

Domestic EV charge point

Active • 2025-26 (T-1)
39.94 MW
HA8 (53 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
39.94 MW
HA9 (22 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
39.94 MW
HD2 (20 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
39.94 MW
Loading map...
Showing 25 locations