Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCTOPUS ENERGY LIMITED

7794 unique locations (68933 components) - Page 227 of 312

Active MW: 1408.48 MW
Inactive MW: 447.19 MW
REVA ROAD STAFFORD STAFFORDSHIRE ST17 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
REWS MEADOW, EXETER, DEVON, EX1 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
Rex Avenue Sheffield South Yorkshire S7 (4 components)

EV charging at residential premises

Active • 2023-24 (T-1)
0.00 MW
RG1 (13 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
RG10 (32 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
RG12 (50 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
RG14 (50 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
RG17 (24 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.08 MW
RG18 (23 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
RG19 (36 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
RG2 (54 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
RG20 (36 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
RG21 (10 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
RG22 (55 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
RG23 (19 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
RG24 (55 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
RG25 (19 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
RG26 (43 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
RG27 (46 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.08 MW
RG30 (23 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.08 MW
RG31 (49 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
RG4 (93 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
RG40 (72 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
RG41 (82 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
RG42 (55 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
Loading map...
Showing 25 locations