Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCTOPUS ENERGY LIMITED

7795 unique locations (69710 components) - Page 212 of 312

Active MW: 1408.48 MW
Inactive MW: 447.19 MW
PE14 (11 components)
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
PE16 (8 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
PE19 (92 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
PE2 (48 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Inactive •
0.08 MW
PE20 (15 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Inactive •
0.04 MW
PE21 (31 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Inactive •
0.04 MW
PE24 (16 components)
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.08 MW
PE25 (7 components)
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
PE26 (17 components)
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
PE27 (24 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
PE28 (140 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.24 MW
PE29 (55 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
PE30 (17 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Inactive •
0.04 MW
PE33 (12 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Inactive •
0.04 MW
PE37 (10 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.08 MW
PE6 (94 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Inactive •
0.04 MW
PE7 (72 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Inactive •
0.08 MW
PE8 (43 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Inactive •
0.08 MW
PE9 (75 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Inactive •
0.04 MW
Loading map...
Showing 25 locations