Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Limejump Virtual 1 Limited

15 unique locations (46 components)

Active MW: 292.61 MW
Inactive MW: 885.12 MW
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (11 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Rock Farm Ledwych St The Street Ludlow Shropshire SY8 2DS (3 components)

19.6 MW Battery Storage facility located at Rock Farm, Shropshire.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Rock Farm Ledwych St The Street Ludlow Shropshire SY8 2DS (1 component)

19.6 MW Battery Storage facility located at Rock Farm, Shropshire.

Inactive • 2018-19 (T-1)
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (5 components)
• 7 MW of Battery Storage loacated at Grantham.
• 7 MW of Battery Storage located at Grantham.
• Battery Storage located at Grantham.
Active • 2028-29 (T-4), 2021-22 (T-1) ...
Land North of Clayhill Farm Westoning MK45 5JD (5 components)
• 6 MW Battery Storage facility located at Westoning.
• 6MW of demand reduction
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land North of Bumpers Farm, Bumpers Lane, Ilmer HP27 9RE (1 component)

5 MW of Battery Storage located at Ilmer.

Inactive • 2021-22 (T-4)
Land at Walworth Farm Bishops Itchington Southam Warwickshire CV47 2SR (1 component)

15 MW Battery Storage facility located at Warwickshire.

Inactive • 2021-22 (T-4)
Hungerford Farm, Winchfield, Hook RG27 8SW (3 components)

5.4 MW of battery storage units across different sites

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Hungerford Farm, Winchfield, Hook RG27 8SW (1 component)

5.4 MW of battery storage units across different sites

Inactive • 2018-19 (T-1)
Clay Tye Rd, Cranham, London Borough of Havering, RM14 3PL, United Kingdom (1 component)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Active • 2024-25 (T-4)
Breach Farm, Cadley Lane, Caldwell, Swadlincote DE12 6RJ (2 components)

9.8 MW Storage facility located at Swadlincote

Inactive • 2018-19 (T-1)
Breach Farm, Cadley Lane, Caldwell, Swadlincote DE12 6RJ (1 component)

9.8 MW Storage facility located at Swadlincote

Inactive • 2018-19 (T-1)
Bluehouse Farm, Newton Bewley, Billingham, Durham TS22 5PW (3 components)

5.2MW of batteries across several sites

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Bluehouse Farm, Newton Bewley, Billingham, Durham TS22 5PW (1 component)

5.2MW of batteries across several sites

Inactive • 2018-19 (T-1)
Asda Farnborough, Portsmouth Rd, Frimley, Surrey GU16 7UJ (7 components)
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
• Standby generation
• Standby generation sub-metered taking site load
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 15 locations