Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

9 unique locations (91 components)

Active MW: 393.19 MW
Inactive MW: 784.54 MW
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (12 components)

Battery Energy Storage System

Active • 2019-20 (T-1), 2020-21 (T-1) ...
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (14 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2019-20 (T-1), 2021-22 (T-1) ...
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (11 components)
• 0.250MW Battery Energy Storage System
• 0.25MW of Demand Reduction
• 5MW of demand reduction
Active • 2019-20 (T-1), 2021-22 (T-1) ...
Forest Lane, Alne, York, YO61 1TU (1 component)

1x 2.000MW 1 hour Energy Storage System

Active • 2024-25 (T-4)
Knottingley Hydropower Station Brotherton Weir Knottingley West Yorkshire WF11 8HR (8 components)

1.200 MW battery storage

Active • 2023-24 (T-1), 2026-27 (T-4) ...
Newlands Farm, Tanners Lane, Fareham, PO14 2HT (11 components)
• 10MW Storage
• 15MW of Battery Energy Storage Systems
• 20MW of Battery Energy Storage Systems
Active • 2022-23 (T-1), 2023-24 (T-1) ...
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (16 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2019-20 (T-1), 2021-22 (T-1) ...
Thrybergh Weir Kilnhurt Mexborough South Yorkshire S64 5TJ (6 components)

1.200MW BESS

Active • 2023-24 (T-1), 2026-27 (T-4) ...
Loading map...
Showing 9 locations