Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

296 unique locations (901 components) - Page 1 of 12

Active MW: 292.61 MW
Inactive MW: 885.12 MW
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (4 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (2 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Willows, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (6 components)
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery Storage unit
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Whitewall Cottages, Upnor Rd, Upnor, Rochester, ME2 4UZ (4 components)

50 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets

LIMEJUMP LTD Rejected ME2
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Weights Farm,Weights Lane,Redditch,B97 6RG (4 components)

4 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery

LIMEJUMP LTD Rejected B97
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Weeke Down, Lanham Lane, Winchester, SO22 5QL (3 components)

35 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets disputes: 35*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

LIMEJUMP LTD Rejected SO22
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (4 components)

29MW of DSR

DSR LIMEJUMP LTD Not Prequalified CM3
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Uskmouth Power Station, West Nash Road, Nash, Newport, Gwent NP18 2BZ (11 components)
• A series of diesel generators although other fuels are also being considered.
• The CMU is a coal-fired set in the Uskmouth power station. This is a mothballed set for which TEC may be sought. As the connection agreement shows, the site has the CEC to export to this quantity, but it will be a matter of securing TEC (of some form) if this set is to come back on the bars.
• The CMU is a coal-fired set in the Uskmouth power station. This is one of the 2 active units.
• ... and 2 more unique descriptions
LIMEJUMP LTD Not Prequalified NP18
Inactive • 2020-21 (T-4), 2017-18 (T-1)
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (5 components)

19 MW of demand reduction

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
16.37 MW
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (1 component)

19 MW of demand reduction

DSR LIMEJUMP LTD Conditional CH5
Inactive • 2019-20 (T-1)
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (6 components)
• 5 MW of demand reduction
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Twin Oaks Farm Land East of Yelt Farm Lower Street Doveridge DE6 5JW (3 components)

5 MW of demand reduction

DSR LIMEJUMP LTD Conditional DE6
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Twin Oaks Farm Land East of Yelt Farm Lower Street Doveridge DE6 5JW (1 component)

5 MW of demand reduction

DSR LIMEJUMP LTD Conditional DE6
Inactive • 2019-20 (T-1)
Trent Basin Nottingham NG2 4DS (3 components)

A 0.5MW Lithium Ion Battery based in Nottingham

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Trent Basin Nottingham NG2 4DS (1 component)

A 0.5MW Lithium Ion Battery based in Nottingham

Inactive • 2018-19 (T-1)
Tir John N Rd, St Thomas, SA1 8NZ (8 components)

Reciprocating engines

Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
Loading map...
Showing 25 locations