Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

130 unique locations (1054 components) - Page 1 of 6

Active MW: 393.19 MW
Inactive MW: 784.54 MW
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (6 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Willows, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (6 components)
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery Storage unit
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
WATERSIDE BELMONT 10 WATERSIDE, BELMONT, BOLTON, LANCASHIRE, BL7 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (7 components)

19 MW of demand reduction

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
16.37 MW
Unit 4 01-May Davygate North Yorkshire Great Britain YO1 8QR (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Unit 14 10 Paternoster Square Great Britain EC4M 7DX (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Unit 1 11 Dalgety Drive Renfrewshire Great Britain PA7 5LN (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Unit 10 Salendine Shopping Centre 144 Moor Hill Road Salendine Nook West Yorkshire Great Britain HD3 3XA (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Unit 10 Moray Park Meadowbank Retail Park Marrionville Rd Great Britain EH7 5TF (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Unit 10 263 Banbury Road Summertown Oxfordshire Great Britain OX2 7HN (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (7 components)
• 5 MW of demand reduction
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Twin Oaks Farm Land East of Yelt Farm Lower Street Doveridge DE6 5JW (4 components)

5 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Trostre Works Llanelli Carmarthenshire SA14 9SD (125 components)

Manufacturing site providing demand response

Active • 2025-26 (T-1), 2023-24 (T-4) ...
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (13 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2024-25 (T-4), 2022-23 (T-4) ...
The Leys, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (9 components)
• 0.8 MW of demand reduction
• 800kW/1100kWh Lithium Ion Battery
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
The Leys Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (5 components)

0.8MW demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Bridge Shopping Centre 11 Somers Road North PO1 1SL (12 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.69 MW
Stroud Green Lane, Fareham, PO14 2HS (4 components)

40MW of Demand Reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Slepe Farm Dorchester Road Lytchett Minster Pool Dorset BH16 6HS (10 components)
• 0.250 MW of demand reduction
• 2MW of DSR
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
1.72 MW
Seamer Carr Landfill Seamer Scarborough YO12 4QA (5 components)
• 3 MW of DSR
• 3 MW of demand reduction
Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
2.74 MW
Loading map...
Showing 25 locations