Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

295 unique locations (895 components) - Page 1 of 12

Active MW: 292.61 MW
Inactive MW: 885.12 MW
1 MW - Oakhill Farm, ST10 4JH (1 component)

1 MW diesel gensets

LIMEJUMP LTD Not Prequalified ST10
Inactive • 2020-21 (T-4)
2 Salterns Lane, Burlesdon, Southampton, SO31 8DH (6 components)

38 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 38*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions … (2)

LIMEJUMP LTD Rejected SO31
Inactive • 2020-21 (T-4), 2017-18 (T-1)
2 Whitehouse Way, Peterlee, County Durham, SR8 2RA (5 components)

3 MW of demand reduction (2)

DSR LIMEJUMP LTD Conditional SR8
Inactive • 2022-23 (T-4), 2019-20 (T-1)
88 Coventry Road Broughton Astley Leicester LE9 6QA (8 components)
• New build power station comprised of multiple reciprocating engines. (2)
• Gas and/or diesel reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Addo Food Group Fulney Lane Spalding Lincolnshire PE12 6EZ (1 component)

4 MW of demand reduction

DSR LIMEJUMP LTD Conditional PE12
Inactive • 2019-20 (T-1)
Addo Food Group Fulney Lane Spalding Lincolnshire PE12 6EZ (2 components)

4 MW of demand reduction (2)

DSR LIMEJUMP LTD Conditional PE12
Inactive • 2022-23 (T-4), 2019-20 (T-1)
ADDO FOOD GROUP, FULNEY LANE, SPALDING, LINCOLNSHIRE, PE12 6EZ (3 components)

0.27MW of demand reduction (2)

DSR LIMEJUMP LTD Conditional PE12
Inactive • 2022-23 (T-4), 2019-20 (T-1)
APPE Ellice Way Wrexham Technology Park 142 LL13 7YL (5 components)

This component is a site with load reduction

LIMEJUMP LTD Not Prequalified LL13
Inactive • 2016-17 (TR)
Ashford Rd, Charing TN27 0DF, United Kingdom (9 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Auchencrosh Converter Station, Ballantrae, Girvan, KA26 OPE (4 components)
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) Public Limited Company, all part of the Mutual Energy Limited group of companies.
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) plc, all part of the Mutual Energy Limited group of companies.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Avely Landfill site, Sandy Lane, Aveley, South Ockendon, Essex, RM15 4XP (4 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Avely Landfill site, Sandy Lane, Aveley, South Ockendon, Essex, RM15 4XP

LIMEJUMP LTD Not Prequalified RM15
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Barrasford Pumping Station Barrasford Hexham NE46 4AY (3 components)
• 0.6MW of turn down
• 4MW of DSR
• Turn down component
Inactive • 2022-23 (T-3), 2019-20 (T-1) ...
Barrasford Pumping Station Barrasford Hexham NE46 4AY (6 components)
• 0.6MW of turn down
• 4MW of DSR
• Turn down component
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (8 components)

Battery Energy Storage System

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Bedhampton Quay, Harts Farm Way, Havant, PO9 1JN (4 components)

29 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets disputes: 29*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

LIMEJUMP LTD Rejected PO9
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Loading map...
Showing 25 locations