LIMEJUMP LTD

17 unique locations (337 components)

Active MW: 292.61 MW
Inactive MW: 885.12 MW
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (19 components)
• Battery Storage Plant
• Load reduction on site supported by non-exporting standby generation.
• Reciprocating genset in acoustic enclosure
Active • 2025-26 (T-4), 2023-24 (T-4) ...
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (16 components)
• 1.200MW BESS
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• District heating implementation of two gas CHP engines with no auxilliary load
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4 Finway Road Hemel Hempstead HP2 7PT (11 components)
• 14.710 MW CHP generation
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2024-25 (T-4), 2022-23 (T-3) ...
ABP Ellesmere, The Abattoir, Hordley, Ellesmere SY12 9BL, United Kingdom (17 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• ROCable hydro units within the BMU are not included in the CMU.
• Turbomach M50 Natural Gas fired CHP unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
ACS&T - Wolverhampton - Site 2, ACS&T Logistics, Park Lane , Wolverhampton, WV10 9QD (30 components)
• Gas fired reciprocating engines.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Ardagh Group - Barnsely Site 2, Burton Road, Monk Bretton South Yorkshire S71 5RP (18 components)
• 3.6MW of demand reduction
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Ashford Rd, Charing TN27 0DF, United Kingdom (10 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• N/A
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (10 components)
• 0.250MW Battery Energy Storage System
• 10 x 2MW gas generator units to be installed on designated land within Southbrook Farm
• 5MW of demand reduction
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Eurac - Dorset, 16 Mannings Heath Road Poole Dorset BH12 4NJ (42 components)
• 10.000MW DSR
• A gas fuelled generating station.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land off Amy Johnson Way, Blackpool, FY4 2RS (14 components)
• A gas fuelled generating station.
• Connah's Quay PS Unit 1 CCGT
• Containerized high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear
Active • 2028-29 (T-4), 2023-24 (T-4) ...
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (20 components)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• Ratcliffe Unit 3 coal-fired unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Plot B at Severn Road Avonmouth BS10 7SE (11 components)
• Existing Generator Battery Energy Storage System
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• New Build Battery Energy Storage Systems
Active • 2025-26 (T-4), 2025-26 (T-1) ...
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (15 components)
• 6 x reciprocating engines
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
• Distribution Centre with behind the meter back-up generation.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Water Tower, Knight Street, Pinchbeck, Spalding, PE11 3XD (3 components)
• 2.6MW of demand reduction
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear
Active • 2024-25 (T-1), 2023-24 (T-4)
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (67 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...