Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

308 unique locations (1928 components) - Page 5 of 13

Active MW: 292.61 MW
Inactive MW: 885.12 MW
Ervin Amasteel 33KV connection George Henry Road Tipton West Midlands DY4 7BZ (2 components)

2.6MW of demand reduction

Inactive • 2022-23 (T-3), 2020-21 (T-1)
Ervin Amasteel 33KV connection George Henry Road Tipton West Midlands DY4 7BZ (4 components)
• 2.6MW of demand reduction
• Energy facility comprising of reciprocating engine sets.
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Essex & Suffolk Water PLC Pumping Station No 1 Feeder 1 Hatfield Road Langford Chelmsford Essex, CM9 6QA (4 components)
• 3 MW of demand reduction
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
Inactive • 2022-23 (T-3), 2019-20 (T-1)
Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (13 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-19, EMD-19 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 141.040 MW At these three HH times, aux load on Unit 5 = 2.597 MW Net generation from Unit 5 = 138.443 MW
• Unit 5 is a Cogeneration unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG244 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power generation units on the site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02).
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Eurac - Dorset, 16 Mannings Heath Road Poole Dorset BH12 4NJ (42 components)
• 10.000MW DSR
• A gas fuelled generating station.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
FEEDER PILLAR 1 (W9920), BROOKFIELD PARK, MANVERS WAY, WATH-UPON-DEARNE, ROTHERHAM, S63 5DJ (4 components)
• 2MW of demand reduction
• Gas reciprocating engines
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Fell View Farm,Preston Road,Grimsargh,Preston,PR2 5SD (8 components)
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Fell View Farm,Preston Road,Grimsargh,Preston,PR2 5SD
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Fell View Farm,Preston Road,Grimsargh,Preston,PR2 5SD Separate connection
Inactive • 2020-21 (T-4), 2017-18 (T-1)
FIDEOAK MILL STOR, BISHOPS HULL, TAUNTON, SOMERSET, TA4 1AF (4 components)

26MW of Turn Down Capability

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Fitzwise Yard Troughbrook Road Hollingwood CHESTERFIELD S43 2JP (3 components)
• 4MW of demand reduction
• CHPs at Queen Elizabeth Hospital
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2025-26 (T-4), 2021-22 (T-4)
Forest Lane, Alne, York, YO61 1TU (1 component)

1x 2.000MW 1 hour Energy Storage System

Active • 2024-25 (T-4)
Frozen Foods Factory Supply, Whapload Primary substation, Rear of 203 Whapload Road, Lowestoft, Suffolk NR32 1XQ (15 components)
• 20MW of DSR
• 3.350 MW gas engine CHP plant
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
FROZEN FOODS FACTORY SUPPLY, WHAPLOAD ROAD PRIMARY SUBSTATION, REAR OF 203, WHAPLOAD ROAD, LOWESTOFT, SUFFOLK, NR32 1XQ (5 components)
• 0.3MW of demand reduction
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Cwm Rheidol Power Station (being one out of two) which is supplied by water from the Dinas Reservoir.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
G66 (45 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.22 MW
Gatwick Electric Forecourt Buckingham Gate Gatwick RH6 0NT (7 components)
• 14.700MW CHP located at Cowie, Stirling.
• A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt
Active • 2025-26 (T-1), 2023-24 (T-1) ...
Gaywood Farm Hilders Lane Edenbridge TN8 6LD (2 components)

7.5MW Lithium Ion Battery Technology

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Gaywood Farm Hilders Lane Edenbridge TN8 6LD (3 components)

7.5MW Lithium Ion Battery Technology

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Gloucester Airport, Down Hatherley Lane, Gloucester, Gloucestershire GL2 9QH (5 components)

38 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Gothic Cottage Farm Mill Rd East Ruston Norwich NR12 9HS (2 components)

A 0.18 MW Storage facility located in Norwich

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Gothic Cottage Farm Mill Rd East Ruston Norwich NR12 9HS (3 components)
• A 0.18 MW Storage facility located in Norwich
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Grimsargh Solar Limited Grimsargh Preston Lancashire PR2 5LE (2 components)

Demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Grimsargh Solar Limited Grimsargh Preston Lancashire PR2 5LE (3 components)

Demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Loading map...
Showing 25 locations