Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

364 unique locations (1283 components) - Page 4 of 15

Active MW: 292.61 MW
Inactive MW: 885.12 MW
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (9 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Bulls Head Farm, Eakley Lanes, Newport Pagnell, MK16 8LP (4 components)

1 x 800kW/1100kWh Lithium Ion Battery

LIMEJUMP LTD Not Prequalified MK16
Inactive • 2020-21 (T-4), 2017-18 (T-1)
"Butchersfield Landfill Site, Rixton Old Hall, Manchester Road, Rixton, WARRINGTON, WA3 6EW" (5 components)
• 2 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery (2)
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Calgarth PS Old Hall Road Windermere LA23 1JA (1 component)

5 MW of demand reduction

DSR LIMEJUMP LTD Conditional TF2
Inactive • 2019-20 (T-1)
Calgarth PS Old Hall Road Windermere LA23 1JA (3 components)

5 MW of demand reduction

DSR LIMEJUMP LTD Conditional LA23
Inactive • 2022-23 (T-4), 2019-20 (T-1)
CALGARTH PS, WINDERMERE, CUMBRIA, LA23 (3 components)

0.2MW of demand reduction

DSR LIMEJUMP LTD Conditional LA2
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Caxton Way, Dinnington, Rotherham, S25 3QE (7 components)
• A 10MW new build gas generating station..
• A 20MW new build gas generating station..
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
CHILTERN COLD STORAGE CHILTERN HOUSE SHREWSBURY AVENUE PETERBOROUGH CAMBRIDGESHIRE PE2 7LB (1 component)

Turn down CMU with volume of 0.4MW before applying de-rating factor

Inactive • 2017-18 (TR)
CHILTERN COLD STORAGE CHILTERN HOUSE SHREWSBURY AVENUE PETERBOROUGH CAMBRIDGESHIRE PE2 7LB (2 components)

Turn down CMU with volume of 0.4MW before applying de-rating factor

Inactive • 2017-18 (TR)
CHILTERN COLD STORAGE, CHILTERN HOUSE, SHREWSBURY AVENUE, PETERBOROUGH, CAMBRIDGESHIRE, PE2 7LB (3 components)

03MW of demand reduction

DSR LIMEJUMP LTD Conditional PE2
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (10 components)
• 0.250MW Battery Energy Storage System
• 0.25MW of Demand Reduction
• 5MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Clowne Rd, Stanfree, Chesterfield, S44 6AG (8 components)
• 1 x 800kW/1100KWh Lithium Ion Battery
• 4MW of DSR
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Commerical Road, Wolverhampton, WV1 3RD (4 components)

5 MW of demand reduction

DSR LIMEJUMP LTD Conditional WV1
Inactive • 2022-23 (T-4), 2019-20 (T-1)
CORPORATION ROAD NEWPORT GWENT NP19 4XE (1 component)

Turn-down CMU with a de-rated volume of 0.869

Inactive • 2017-18 (TR)
CORPORATION ROAD NEWPORT GWENT NP19 4XE (2 components)

Turn-down CMU with a de-rated volume of 0.869

Inactive • 2017-18 (TR)
Coveris Unit 5 Stanley, County Durham, DH9 9XH (3 components)

Several components

Inactive • 2017-18 (TR)
Loading map...
Showing 25 locations