Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

236 unique locations (1586 components) - Page 2 of 10

Active MW: 292.61 MW
Inactive MW: 885.12 MW
Addo Food Group Fulney Lane Spalding Lincolnshire PE12 6EZ (2 components)
• 4 MW of demand reduction
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2019-20 (T-1)
ADDO FOOD GROUP, FULNEY LANE, SPALDING, LINCOLNSHIRE, PE12 6EZ (3 components)
• 0.27MW of demand reduction
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Allington EfW, Laverstoke Road, 20/20 Business Park, Allington, Maidstone, Kent, ME16 0LE (25 components)
• Demand reduction
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• This CMU identifier is the replacement of ALL001 due to changes of unit capacity and connection agreement. The connection capacity is based on historic data as per rule 3.5.3 Allington Integrated Waste Management Facility,500kT Energy from Waste Plant with c. 36MW electrical output. The auxiliary load is not included in the connection capacity i.e. The export is net. There are 2 different MPAN 1900070394446 and 1900070467983, accumulating to the total output.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Ardagh Group - Barnsely Site 2, Burton Road, Monk Bretton South Yorkshire S71 5RP (18 components)
• 3.6MW of demand reduction
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Asda Bordesley Green, 271 Bordsley Green , Birmingham, B9 5EY (12 components)
• 0.6MW of turn down
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Coalville, Ashby Road , Coalville, LE673LF (11 components)
• Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the overall CMU capacity of 3.557 MW as per the 3 highest export peaks.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Greengates, 147 New Line , Bradford, BD10 0BT (12 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Load curtailment from refridgeration
• Pembroke 41 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Kilmarnock, 10 Queens Drive , Kilmarnock, KA1 3XF (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.19 MW
Asda Leyland, 171 Towngate , Leyland, PR252TE (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.80 MW
Asda Lincoln North Hykeham, Newark Road LN6 8JY (8 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Meanwood, 34 Green Road , Leeds, LS6 4JP (12 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Pilsworth, Pilsworth Industrial Estate Pilsworth Road, Bury, BL9 8RS (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Thornaby, Allensway Thornaby Town Centre TS17 9EN (8 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Ashford Rd, Charing TN27 0DF, United Kingdom (10 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• N/A
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Barnsley Facilities Services Limited Estates & Facilities Department Gawber Road Barnsley S75 2EP (14 components)
• 1 MW CHP generation
• 30MW/30MWh one hour battery storage asset located near BURWB1 asset
• Siemens SGT200 based CHP
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Barrasford Pumping Station Barrasford Hexham NE46 4AY (4 components)
• 0.6MW of turn down
• 4MW of DSR
• Turn down component
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Barrasford Pumping Station Barrasford Hexham NE46 4AY (5 components)
• 0.6MW of turn down
• 4MW of DSR
• Turn down component
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Barrow Man Road Birchington Kent CT7 0AX (13 components)
• Load curtailment
• Syngenta - CHP unit
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Barton Hill Way, Torquay, TQ2 8JG (8 components)
• 0.15MW of demand reduction
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Beeches Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (3 components)
• 0.2MW of turn-down
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2018-19 (T-1)
Breach Farm Cadley Lane Caldwell Swadlincote Derbyshire DE12 6RJ (2 components)

9.8MW of turn down

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Loading map...
Showing 25 locations