Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

401 unique locations (2148 components) - Page 13 of 17

Active MW: 292.61 MW
Inactive MW: 885.12 MW
Plot B at Severn Road Avonmouth BS10 7SE (11 components)
• Existing Generator Battery Energy Storage System
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• New Build Battery Energy Storage Systems
Active • 2025-26 (T-4), 2025-26 (T-1) ...
P.O. Box 81, BILLINGHAM, TS23 1XT (5 components)

This component is a site with load reduction

Inactive • 2016-17 (TR)
Poole Hospital Longfleet R Poole BH15 2JB (2 components)

0.85 MW CHP Located at Poole Hospital

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Poole Hospital Longfleet R Poole BH15 2JB (3 components)
• 0.85 MW CHP Located at Poole Hospital
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Inactive • 2022-23 (T-3), 2018-19 (T-1)
Poplars, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (10 components)
• 1 MW of demand reduction
• 1000kW/1200kWh Lithium Ion Battery
• Gas fired reciprocating engines
Inactive • 2022-23 (T-3), 2020-21 (T-4) ...
Poplars Solar Farm Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (3 components)
• 1MW of demand reduction
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2020-21 (T-4), 2018-19 (T-1)
PORK FARMS CASPIAN LTD, STERTE AVENUE, POOLE, DORSET, BH15 2AS (3 components)

0.36MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
PORK FARMS LIMITED, CROSSGATE DRIVE, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 1LW (3 components)

0.18 MW of Demand Reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (7 components)
• 0.5MW of demand reduction
• A generating station consisting on multiple reciprocating engines and alternators located on a single site
• Sizewell B Power Station CMU 2: [SZ2-19] T_SIZB-2 + (50% x T_SIZB-D)
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Questmap Business park Drivers Wharf Northam Road Southampton SO14 0PF (2 components)

1.5MW battery located in Southampton

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Questmap Business park Drivers Wharf Northam Road Southampton SO14 0PF (3 components)
• 1.5MW battery located in Southampton
• The East West Interconnector (EWIC) is a 400kV HVDC link between Connah's Quay in Wales and Woodland in Ireland.
Inactive • 2023-24 (T-4), 2018-19 (T-1)
Recycling Lives Recycling Park Longridge Road Preston Lancashire PR2 5BX (2 components)

2 MW demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Recycling Lives Recycling Park Longridge Road Preston Lancashire PR2 5BX (3 components)
• 1 x hydro turbine & synchronous generator
• 2 MW demand reduction
Active • 2027-28 (T-4), 2019-20 (T-1)
RIDING MILL PUMPING STATION Riding Mill NE43 7 (1 component)

Turn down component

Inactive • 2017-18 (TR)
RIDING MILL PUMPING STATION Riding Mill NE43 7 (1 component)

Turn down component

Inactive • 2017-18 (TR)
RIDING MILL PUMPING STATION Riding Mill NE43 7UA (1 component)

1.6MW of demand reduction

Inactive • 2019-20 (T-1)
RIDING MILL PUMPING STATION Riding Mill NE43 7UA (3 components)

1.6MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Riverside Crossgate Drive Queens Drive Industrial Estate NG2 1LW (2 components)

5 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Riverside Crossgate Drive Queens Drive Industrial Estate NG2 1LW (2 components)

5 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
RUFFORD STORAGE, RUFFORD COLLIERY LANE, RAINSWORTH, MANSFIELD, NOTTINGHAMSHIRE, NG21 0HR (9 components)
• 6MW of DSR
• A gas engine CHP site providing hot water to a local district heating network
• Tongland hydro power station - Unit 2 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
5.17 MW
Safran Landing Systems Services UK Ltd, Safran MRO UK, METEOR BUSINESS PARK, CHELTENHAM ROAD EAST, GLOUCESTER, GLOUCESTERSHIRE, GL2 9QL (11 components)
• 1.500MW Battery Energy Storage System
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Sainsburys Tower B 11 Mitchigan Avenue Salford Quays Greater Manchester Great Britain M50 2HA (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Salford Lodge Pitchill Evesham WR11 8SN (2 components)

0.1MW Tesla battery located at Eversham

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Loading map...
Showing 25 locations