LIMEJUMP LTD

27 unique locations (404 components) - Page 1 of 2

Active MW: 292.61 MW
Inactive MW: 885.12 MW
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (16 components)
• 1.200MW BESS
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• District heating implementation of two gas CHP engines with no auxilliary load
Active • 2026-27 (T-4), 2025-26 (T-4) ...
ACS&T - Grimsby - Site 1, Estate Road 2, South Humberside Trading Estate, Grimsby DN31 2TG (16 components)
• Hunterston B Power Station CMU 8: [HU8-19] T_HUNB-8 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
ACS&T - Wolverhampton - Site 2, ACS&T Logistics, Park Lane , Wolverhampton, WV10 9QD (30 components)
• Gas fired reciprocating engines.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Ardagh Group - Barnsely Site 2, Burton Road, Monk Bretton South Yorkshire S71 5RP (18 components)
• 3.6MW of demand reduction
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Asda Coalville, Ashby Road , Coalville, LE673LF (11 components)
• Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the overall CMU capacity of 3.557 MW as per the 3 highest export peaks.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Kilmarnock, 10 Queens Drive , Kilmarnock, KA1 3XF (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.19 MW
Asda Leyland, 171 Towngate , Leyland, PR252TE (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.80 MW
Asda Lincoln North Hykeham, Newark Road LN6 8JY (8 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Pilsworth, Pilsworth Industrial Estate Pilsworth Road, Bury, BL9 8RS (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Thornaby, Allensway Thornaby Town Centre TS17 9EN (8 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Barrow Man Road Birchington Kent CT7 0AX (13 components)
• Load curtailment
• Syngenta - CHP unit
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Barton Hill Way, Torquay, TQ2 8JG (8 components)
• 0.15MW of demand reduction
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2025-26 (T-4), 2024-25 (T-1) ...
BATTERSEA POWER STATION BATTERSEA POWER STATION LONDON LONDON SW11 8AH (8 components)

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the …

Active • 2027-28 (T-4), 2025-26 (T-1) ...
BATTERSEA POWER STATION LONDON SW11 8AH (7 components)

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Bristol Port near Land next to Chittening Road,Bristol,BS11 0YU (5 components)
• 20 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Bristol Port near Land next to Chittening Road,Bristol,BS11 0YU
• Existing Generation on existing site - CHP
Active • 2024-25 (T-1), 2020-21 (T-4) ...
Church Manorway, Erith DA8 1DL (60 components)
• N/A
• gas-fired CHP unit
Active • 2025-26 (T-4), 2024-25 (T-1) ...
G66 (45 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.22 MW
Livesey Branch Rd, Feniscowles, Blackburn, Lancashire, BB2 5HX (14 components)
• 5MW of demand reduction
• Small Combined Cycle Gas Turbine plant with contracted connection capacity 75MVA or 60MW at 0.8PF
• Small Combined Cycle Gas Turbine plant with registered capacity 75MVA or 60MW at 0.8PF.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (20 components)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• Ratcliffe Unit 3 coal-fired unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Newlands Farm, Tanners Lane, Fareham, PO14 2HT (9 components)
• 10MW Storage
• 15MW of Battery Energy Storage Systems
• Gas fuelled CHP generation plant
Active • 2025-26 (T-4), 2024-25 (T-1) ...
PL14 (19 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
8.69 MW
Plot 168, Block D, Unit 11 Greenwood Way OX11 6DL (9 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2024-25 (T-1) ...
0.57 MW
Plot B at Severn Road Avonmouth BS10 7SE (11 components)
• Existing Generator Battery Energy Storage System
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• New Build Battery Energy Storage Systems
Active • 2025-26 (T-4), 2025-26 (T-1) ...
The Bridge Shopping Centre 11 Somers Road North PO1 1SL (11 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
11.30 MW