LIMEJUMP LTD

5 unique locations (64 components)

Active MW: 292.61 MW
Inactive MW: 885.12 MW
Asda Coalville, Ashby Road , Coalville, LE673LF (11 components)
• Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the overall CMU capacity of 3.557 MW as per the 3 highest export peaks.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Meanwood, 34 Green Road , Leeds, LS6 4JP (12 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Land At Mitchells Industrial Park, Bradberry Balk Lane, Wombwell, Barnsleym, S73 8HR (17 components)
• 5 MW of demand reduction
• CHP Unit
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Newlands Farm, Tanners Lane, Fareham, PO14 2HT (9 components)
• 10MW Storage
• 15MW of Battery Energy Storage Systems
• Gas fuelled CHP generation plant
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (15 components)
• 6 x reciprocating engines
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
• Distribution Centre with behind the meter back-up generation.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 5 locations