LIMEJUMP LTD

77 unique locations (373 components) - Page 1 of 4

Active MW: 292.61 MW
Inactive MW: 885.12 MW
2 Salterns Lane, Burlesdon, Southampton, SO31 8DH (6 components)

38 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 38*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions … (2)

LIMEJUMP LTD Rejected SO31
Inactive • 2020-21 (T-4), 2017-18 (T-1)
88 Coventry Road Broughton Astley Leicester LE9 6QA (8 components)
• New build power station comprised of multiple reciprocating engines. (2)
• Gas and/or diesel reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Asda Greengates, 147 New Line , Bradford, BD10 0BT (12 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Kilmarnock, 10 Queens Drive , Kilmarnock, KA1 3XF (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.19 MW
Asda Leyland, 171 Towngate , Leyland, PR252TE (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.80 MW
Asda Meanwood, 34 Green Road , Leeds, LS6 4JP (12 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Pilsworth, Pilsworth Industrial Estate Pilsworth Road, Bury, BL9 8RS (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Auchencrosh Converter Station, Ballantrae, Girvan, KA26 OPE (4 components)
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) Public Limited Company, all part of the Mutual Energy Limited group of companies.
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) plc, all part of the Mutual Energy Limited group of companies.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Avely Landfill site, Sandy Lane, Aveley, South Ockendon, Essex, RM15 4XP (4 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Avely Landfill site, Sandy Lane, Aveley, South Ockendon, Essex, RM15 4XP

LIMEJUMP LTD Not Prequalified RM15
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Barrow Man Road Birchington Kent CT7 0AX (12 components)
• Two CHP engines in horticultural environment with no auxilliary load
• Two 2.7MW CHP engines. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Barton Hill Way, Torquay, TQ2 8JG (9 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
• New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Bedhampton Quay, Harts Farm Way, Havant, PO9 1JN (4 components)

29 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets disputes: 29*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

LIMEJUMP LTD Rejected PO9
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Bevercotes Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (4 components)

3 x 1MW / 1.2 MWh BYD Lithium Ion Battery

LIMEJUMP LTD Rejected DN22
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Birds Eye Limited. Whapload Road, Lowestoft, Suffolk NR32 1XQ (8 components)
• 1 x 3.3 MW gas engine CHP plant
• 3.348 MW gas engine CHP plant
Inactive • 2021-22 (T-4), 2018-19 (T-1) ...
BLUE HOUSE FARM DALTON BACK LANE CLAXTON BILLINGHAM DURHAM TS22 5PW (2 components)

Battery CMU - 1.2MW battery with de-rated vol of 1.043

Inactive • 2017-18 (T-1)
BLUE HOUSE FARM DALTON BACK LANE CLAXTON BILLINGHAM DURHAM TS22 5PW (2 components)

Battery CMU - 1.2MW battery with de-rated vol of 1.043

Inactive • 2017-18 (T-1)
Botley Rd, Southampton SO32 1DR (6 components)

25 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 25*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

LIMEJUMP LTD Rejected SO32
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Bourne Park Solar Farm, Bourne Park, Piddlehinton, Dorset. DT2 7TU (3 components)

800kW/ 1100kWh BYD Lithium Ion Battery

LIMEJUMP LTD Not Prequalified DT2
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Bristol Port near Land next to Chittening Road,Bristol,BS11 0YU (4 components)

20 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Bristol Port near Land next to Chittening Road,Bristol,BS11 0YU

LIMEJUMP LTD Rejected BS11
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Brook Hall Farm,North Bradley,Trowbridge,Wiltshire,BA14 9PT (5 components)

1 x 0.8MW / 1.1 MWh BYD Lithium Ion Battery: at Brook Hall Farm,North Bradley,Trowbridge,Wiltshire,BA14 9PT

LIMEJUMP LTD Rejected BA14
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Bulls Head Farm, Eakley Lanes, Newport Pagnell, MK16 8LP (4 components)

1 x 800kW/1100kWh Lithium Ion Battery

LIMEJUMP LTD Not Prequalified MK16
Inactive • 2020-21 (T-4), 2017-18 (T-1)
"Butchersfield Landfill Site, Rixton Old Hall, Manchester Road, Rixton, WARRINGTON, WA3 6EW" (5 components)
• 2 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery (2)
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Cowie, Stirling, FK7 7BQ (6 components)

2*7.5MW Gas Turbines

Inactive • 2020-21 (T-4), 2017-18 (T-1)